General Service Administration had implemented a phase construction management approach for new Federal construction. Phase construction involves the overlapping of design and construction activities in a carefully planned, executed, and controlled order. In response to the above change, GSA adopted a modified IBM-CPM package. The system itself is made up of modules or groups of reports that are structured by type of information and by management level. As a result of information at two universities, pitfalls of this GSA-CMCS are presented. At the present time, the construction industry is in need of a good CPM-project management and control system accessible to all contractors and educators at a low cost—GSA-CMCS does not fulfill this general requirement at the present stage.
General Service Administration had implemented a phase construction management approach for new Federal construction. Phase construction involves the overlapping of design and construction activities in a carefully planned, executed, and controlled order. In response to the above change, GSA adopted a modified IBM-CPM package. The system itself is made up of modules or groups of reports that are structured by type of information and by management level. As a result of information at two universities, pitfalls of this GSA-CMCS are presented. At the present time, the construction industry is in need of a good CPM-project management and control system accessible to all contractors and educators at a low cost—GSA-CMCS does not fulfill this general requirement at the present stage.
Pitfalls of GSA-CMCS Software
Popescu, Calin M. (author)
Journal of the Construction Division ; 105 ; 95-106
2021-01-01
121979-01-01 pages
Article (Journal)
Electronic Resource
Unknown
Microstructural investigation of interfaces in CMCs
British Library Online Contents | 2002
|Graded Ceramic-Metal composites (CMCs)
British Library Conference Proceedings | 2000
|