A platform for research: civil engineering, architecture and urbanism
Role of Contract and Specifications in Foundations Construction
A contract should attempt to definitely fix the obligations of each party in order to avoid ambiguities and indefiniteness leading to controversy. A practice of attempting to rely on exculpatory clauses so as to attempt to impose all risks on the contractor is a poor policy and generally ineffective. Inadequate preliminary studies and design is less expensive engineering but ultimately most expensive contracting.
Role of Contract and Specifications in Foundations Construction
A contract should attempt to definitely fix the obligations of each party in order to avoid ambiguities and indefiniteness leading to controversy. A practice of attempting to rely on exculpatory clauses so as to attempt to impose all risks on the contractor is a poor policy and generally ineffective. Inadequate preliminary studies and design is less expensive engineering but ultimately most expensive contracting.
Role of Contract and Specifications in Foundations Construction
Greenberg, Max E. (author)
Journal of the Construction Division ; 100 ; 113-116
2021-01-01
41974-01-01 pages
Article (Journal)
Electronic Resource
Unknown
Construction specifications and regulations (SNiP) for foundations of hydraulic structures
Online Contents | 1968
|