A platform for research: civil engineering, architecture and urbanism
Borehole Stability Research on Weihe HDD Crossing
In the last 20 years, with the improvement of HDD crossing technology, it has become a popular and increasingly viable method for infrastructure installation in different areas within the construction industry, such as natural gas, electrical power and communication industries. Based on Geotechnical Generalized Plastic Mechanics, Establish the stability model of borehole that is multilevel reamed with FEM, a case is studied on Weihe HDD crossing of west-east gas pipeline engineering second-line. In the research, the tensile and shear failure criterion of geotechnical material is set simultaneously. Through the dynamic simulation of the shear and tensile stress, not only the stability judgment and instability failure process but also a mechanical estimate method to the stability of borehole could have been gotten, and the paper presents a suit of the precautionary measures. For the reaming and pipeline lying safely and fast, the available numerical solutions supply theoretical basis and technical support.
Borehole Stability Research on Weihe HDD Crossing
In the last 20 years, with the improvement of HDD crossing technology, it has become a popular and increasingly viable method for infrastructure installation in different areas within the construction industry, such as natural gas, electrical power and communication industries. Based on Geotechnical Generalized Plastic Mechanics, Establish the stability model of borehole that is multilevel reamed with FEM, a case is studied on Weihe HDD crossing of west-east gas pipeline engineering second-line. In the research, the tensile and shear failure criterion of geotechnical material is set simultaneously. Through the dynamic simulation of the shear and tensile stress, not only the stability judgment and instability failure process but also a mechanical estimate method to the stability of borehole could have been gotten, and the paper presents a suit of the precautionary measures. For the reaming and pipeline lying safely and fast, the available numerical solutions supply theoretical basis and technical support.
Borehole Stability Research on Weihe HDD Crossing
Lin, Tiejun (author) / Lian, Zhanghua (author) / Zhu, Xiaohua (author) / Jia, Yanjie (author) / Li, Jinhe (author) / Ma, Xuqiang (author)
International Conference on Pipelines and Trenchless Technology 2011 ; 2011 ; Beijing, China
ICPTT 2011 ; 2127-2133
2011-10-07
Conference paper
Electronic Resource
English
Aktuelles - Die Weihe des Hauses
Online Contents | 2002
Water Quality Evaluation Research Based on Fuzzy Mathematics in Weihe
British Library Conference Proceedings | 2014
|Application of Crossing Borehole Hydraulic Fracturing in Coal Mine
Trans Tech Publications | 2013
|