A platform for research: civil engineering, architecture and urbanism
Ready, Set, Launch
The replacement of a Warren through-truss bridge with a new structure similar in appearance over a very busy, 23-track rail yard in Minneapolis required prefabrication of steel trusses and an innovative launching method.
Ready, Set, Launch
The replacement of a Warren through-truss bridge with a new structure similar in appearance over a very busy, 23-track rail yard in Minneapolis required prefabrication of steel trusses and an innovative launching method.
Ready, Set, Launch
Furrer, Martin (author) / Hasbrouck, Greg (author) / Yuzna, Jack (author)
Civil Engineering Magazine Archive ; 88 ; 70-75
2019-01-01
62018-01-01 pages
Article (Journal)
Electronic Resource
Unknown
Launch of the Making Cities Resilient: My City is getting ready
Emerald Group Publishing | 2011
Database-Driven Coatings Management Keeps Kennedy Space Center Ready to Launch
British Library Online Contents | 2010
|