A platform for research: civil engineering, architecture and urbanism
Resource Sharing-Based Multiobjective Multistage Construction Equipment Allocation under Fuzzy Environment
This paper presents a resource sharing-based construction equipment allocation problem with multiple stages under a fuzzy environment. A multiobjective multistage decision-making model is established in which the equipment failure rate is regarded as a fuzzy variable. In contrast to traditional assignment problems, the principle of resource sharing modes including space and time sharing is considered to be based on the project practice. In addition, a dynamic programming-based genetic algorithm is developed to find feasible solutions and a dynamic programming-based initialization, and crossover and mutation are designed to avoid infeasible solutions. Finally, the Jinping-I Hydropower Project is used as a practical example to demonstrate the practicality and efficiency of the model. The comparisons and analysis of results are presented to highlight the performance of the optimization method, which is proved to be more effective and efficient than the standard genetic algorithm.
Resource Sharing-Based Multiobjective Multistage Construction Equipment Allocation under Fuzzy Environment
This paper presents a resource sharing-based construction equipment allocation problem with multiple stages under a fuzzy environment. A multiobjective multistage decision-making model is established in which the equipment failure rate is regarded as a fuzzy variable. In contrast to traditional assignment problems, the principle of resource sharing modes including space and time sharing is considered to be based on the project practice. In addition, a dynamic programming-based genetic algorithm is developed to find feasible solutions and a dynamic programming-based initialization, and crossover and mutation are designed to avoid infeasible solutions. Finally, the Jinping-I Hydropower Project is used as a practical example to demonstrate the practicality and efficiency of the model. The comparisons and analysis of results are presented to highlight the performance of the optimization method, which is proved to be more effective and efficient than the standard genetic algorithm.
Resource Sharing-Based Multiobjective Multistage Construction Equipment Allocation under Fuzzy Environment
Xu, Jiuping (author) / Meng, Jun (author) / Zeng, Ziqiang (author) / Wu, Shiyong (author) / Shen, Manbin (author)
Journal of Construction Engineering and Management ; 139 ; 161-173
2012-05-03
132013-01-01 pages
Article (Journal)
Electronic Resource
English
British Library Online Contents | 2013
|Multiobjective Optimization of Resource Leveling and Allocation during Construction Scheduling
Online Contents | 2011
|Multiobjective Optimization of Resource Leveling and Allocation during Construction Scheduling
British Library Online Contents | 2011
|Multiobjective Fuzzy Linear Programming Under Uncertain Resource Parameters
HENRY – Federal Waterways Engineering and Research Institute (BAW) | 2012
|