Construction Response of a Skewed, Prestressed I-Girder Bridge
Safety considerations and alignment issues dominate the design of highways and highway bridges and, as a result, skewed girder alignments relative to the abutments and piers are common for highway bridges. It has been reported in the past that approximately 40% of all bridge deck area in North America is on skewed alignments. While number of skewed structures continues to increase, limited research has been performed investigating their behavior. This paper will summarize research conducted at the Pennsylvania State University that examined the level of deformations and stresses generated in a skewed, prestressed, I-girder bridge constructed in central Pennsylvania. Models were created that studied levels of lateral bending and torsion experienced by the girders during deck placement, the effects of deck stiffness development during deck placement, and the effect of support conditions on the constructed bridge. A discussion of the models that were created along with limited findings, focusing on lateral deformations and bending stresses induced during the deck pour, will be given.
Construction Response of a Skewed, Prestressed I-Girder Bridge
Safety considerations and alignment issues dominate the design of highways and highway bridges and, as a result, skewed girder alignments relative to the abutments and piers are common for highway bridges. It has been reported in the past that approximately 40% of all bridge deck area in North America is on skewed alignments. While number of skewed structures continues to increase, limited research has been performed investigating their behavior. This paper will summarize research conducted at the Pennsylvania State University that examined the level of deformations and stresses generated in a skewed, prestressed, I-girder bridge constructed in central Pennsylvania. Models were created that studied levels of lateral bending and torsion experienced by the girders during deck placement, the effects of deck stiffness development during deck placement, and the effect of support conditions on the constructed bridge. A discussion of the models that were created along with limited findings, focusing on lateral deformations and bending stresses induced during the deck pour, will be given.
Construction Response of a Skewed, Prestressed I-Girder Bridge
Linzell, Daniel G. (author) / Bennett, Aaron (author)
Structures Congress 2010 ; 2010 ; Orlando, Florida, United States
Structures Congress 2010 ; 800-807
2010-05-18
Conference paper
Electronic Resource
English
Construction Response of a Skewed, Prestressed I-Girder Bridge
British Library Conference Proceedings | 2010
|CONSTRUCTION METHOD OF PRESTRESSED COMPOSITE GIRDER BRIDGE
European Patent Office | 2015