The trans-alpine deep tunnels (The Alptransit Scheme) can justifiably be hailed as the tunneling project of the 21st century even though the century is still young. It is a triumph of European and international cooperation; even South African shaftsinkers, mining and geotechnical engineers were part of this project. Last but not least the Swiss people have to be congratulated for their patience and trust they placed in their tunneling engineers. The project is not just a 57km dual railway tunnel, the longest in the world, but an extensive tunneling system totaling close to 155km including access shafts, ventilation and safety shafts and tunnels. Of particular significance within this project is the PIORA zone, a funnel-shaped syncline consisting of running formations of sugary dolomite. At one point it was believed that the PIORA had the potential to "sink" the entire base tunnel project. Now almost forgotten, it is the authors opinion that the "warning signals" sent out by the PIORA contributed to the cautious, possibly conservative but professional and meticulous approach of the engineers which ultimately contributed significantly to the success of the project, hence the title: "The PIORA: blessing in disguise".
The trans-alpine deep tunnels (The Alptransit Scheme) can justifiably be hailed as the tunneling project of the 21st century even though the century is still young. It is a triumph of European and international cooperation; even South African shaftsinkers, mining and geotechnical engineers were part of this project. Last but not least the Swiss people have to be congratulated for their patience and trust they placed in their tunneling engineers. The project is not just a 57km dual railway tunnel, the longest in the world, but an extensive tunneling system totaling close to 155km including access shafts, ventilation and safety shafts and tunnels. Of particular significance within this project is the PIORA zone, a funnel-shaped syncline consisting of running formations of sugary dolomite. At one point it was believed that the PIORA had the potential to "sink" the entire base tunnel project. Now almost forgotten, it is the authors opinion that the "warning signals" sent out by the PIORA contributed to the cautious, possibly conservative but professional and meticulous approach of the engineers which ultimately contributed significantly to the success of the project, hence the title: "The PIORA: blessing in disguise".
The PIORA: Blessing in Disguise
Heinz, W. F. (author)
Proceedings of the Fourth International Conference on Grouting and Deep Mixing ; 2012 ; New Orleans, Louisiana, United States
Grouting and Deep Mixing 2012 ; 1901-1911
2012-08-17
Conference paper
Electronic Resource
English
Piles , Mixing , Grouting , Highways and roads , Chemical grouting , Mining , Anchors , Cement , Foundations , Cutoffs , Hydraulic structures , Tunnels
The PIORA: Blessing in Disguise
British Library Conference Proceedings | 2012
|Tracerversuche in der Piora-Zone
British Library Conference Proceedings | 1999
|LiDAR: A Blessing in Disguise for Watershed Modeling
British Library Conference Proceedings | 2010
|Hydrogeologie de la zone de Piora
British Library Conference Proceedings | 1999
|Is a new office a blessing in disguise? The strategic importance of relocation
Emerald Group Publishing | 2021
|