A platform for research: civil engineering, architecture and urbanism
Allocation of the Tennessee Valley Authority Projects
The various theories applicable to the allocation of costs of a multiple purpose water control project, and the procedure followed by the Tennessee Valley Authority in allocating the cost of its first three dams to navigation, flood control, and power, are presented in this paper. It is shown that a large difference in the allocation of the comm on costs of a project affects to a much lesser degree the proportions of the total cost charged to the individual purposes. Consequently, the final allocations are approximately correct, within reasonable limits, regardless of the exact method adopted.
Allocation of the Tennessee Valley Authority Projects
The various theories applicable to the allocation of costs of a multiple purpose water control project, and the procedure followed by the Tennessee Valley Authority in allocating the cost of its first three dams to navigation, flood control, and power, are presented in this paper. It is shown that a large difference in the allocation of the comm on costs of a project affects to a much lesser degree the proportions of the total cost charged to the individual purposes. Consequently, the final allocations are approximately correct, within reasonable limits, regardless of the exact method adopted.
Allocation of the Tennessee Valley Authority Projects
Parker, Theodore B. (author)
Transactions of the American Society of Civil Engineers ; 108 ; 174-187
2021-01-01
141943-01-01 pages
Article (Journal)
Electronic Resource
Unknown
Allocation of Tennessee Valley Authority projects
Engineering Index Backfile | 1942
|Engineering Index Backfile | 1939
Foundation experiences, Tennessee Valley Authority
Engineering Index Backfile | 1940
Retrofitting the Tennessee Valley Authority
British Library Conference Proceedings | 2014
|Foundation experiences, Tennessee valley authority
Engineering Index Backfile | 1940