Structural design of an electrical energy plant of Estonia ; Structural design of an energy producer of Estonia
This master thesis is going to talk about a calculate and structural design of a factory that will be build for heating and electricity production. The name of this company is Eesti Energia AS Iru Elektrijaam. This factory have some buildings and we have choosen one of them because the procediment for the others it is the same. In the edificie choosen is used like flue gas treatment hall. The factory is localized in Maardu, Tallinn, (Estonia) and during this semester will be started the works for build it. The results of the thesis will be compared with the results of differents kind of software and with the real results of the engineer who designed this project. For this study, it will use the Eurocode 1(Actions on Estructures) and Eurocode 3(Design of steel structures). The software, that we will check our final results, will be applicated the eurocode parametres too. We should mention that in preparing the thesis has always had the idea that this project will respresent the reality as possible. The project that was released and it may well be rated against other with similar characteristics and, therefore, has had as primary objective to comply with the regulations on projects of this nature and have a competitive cost. ; Outgoing
Structural design of an electrical energy plant of Estonia ; Structural design of an energy producer of Estonia
This master thesis is going to talk about a calculate and structural design of a factory that will be build for heating and electricity production. The name of this company is Eesti Energia AS Iru Elektrijaam. This factory have some buildings and we have choosen one of them because the procediment for the others it is the same. In the edificie choosen is used like flue gas treatment hall. The factory is localized in Maardu, Tallinn, (Estonia) and during this semester will be started the works for build it. The results of the thesis will be compared with the results of differents kind of software and with the real results of the engineer who designed this project. For this study, it will use the Eurocode 1(Actions on Estructures) and Eurocode 3(Design of steel structures). The software, that we will check our final results, will be applicated the eurocode parametres too. We should mention that in preparing the thesis has always had the idea that this project will respresent the reality as possible. The project that was released and it may well be rated against other with similar characteristics and, therefore, has had as primary objective to comply with the regulations on projects of this nature and have a competitive cost. ; Outgoing
Structural design of an electrical energy plant of Estonia ; Structural design of an energy producer of Estonia
De Quintana Garrido, Jose Maria (author) / Talvik, Ivar
2010-01-01
Miscellaneous
Electronic Resource
English
Centrals elèctriques -- Disseny i construcció , Àrees temàtiques de la UPC::Edificació::Elements constructius d'edificis::Càlcul d'estructures d'edificis , Structural design , Disseny d'estructures , Àrees temàtiques de la UPC::Energies::Energia elèctrica , Electric power plants -- Design and construction
DDC:
690
Design of the first net-zero energy buildings in Estonia
Taylor & Francis Verlag | 2016
|Online Contents | 2007