Perencanaan Sistem Plambing Air Buangan Gedung Rusunawa Mahasiswa Universitas Andalas
According to Indonesian National Standard (SNI) No.03-7065-2005, the building with more than 500 inhabitants, should prepare plumbing system design. The plumbing sewerage design of student flats building referred to SNI 03-6481- 2000 and SNI 03-7065-2005. Sewerage system for black- and grey water was discharged separately. Black water comes from the closet and the toilet clean out, while grey water comes from the lavatory, sink and floor drain. The wastewater flow rate is determined based on the plumbing fixtures. The sewage flowed partially full in horizontal pipe, and discharged into the standpipe in the the building shaft then flowed to the wastewater treatment plant i.e anaerobic-aerobic bioseptic tank. Grease traps are mounted at the sink to separate oils and fats. Each wastewater fixture is equipped with a fixture vent connected to the standpipe vent which extended through the roof to outdoors. Vent system consists of the vent circuit that connected to the toilet and the floor drain respectively, and the single vent that connected to the sink and the lavatory respectively. Black water sewerage pipes used 3-4 inches PVC, while the grey water sewerages used 1 ½ - 2 ½ inches PVC, and vent used pipe 2-4 inches PVC.
Perencanaan Sistem Plambing Air Buangan Gedung Rusunawa Mahasiswa Universitas Andalas
According to Indonesian National Standard (SNI) No.03-7065-2005, the building with more than 500 inhabitants, should prepare plumbing system design. The plumbing sewerage design of student flats building referred to SNI 03-6481- 2000 and SNI 03-7065-2005. Sewerage system for black- and grey water was discharged separately. Black water comes from the closet and the toilet clean out, while grey water comes from the lavatory, sink and floor drain. The wastewater flow rate is determined based on the plumbing fixtures. The sewage flowed partially full in horizontal pipe, and discharged into the standpipe in the the building shaft then flowed to the wastewater treatment plant i.e anaerobic-aerobic bioseptic tank. Grease traps are mounted at the sink to separate oils and fats. Each wastewater fixture is equipped with a fixture vent connected to the standpipe vent which extended through the roof to outdoors. Vent system consists of the vent circuit that connected to the toilet and the floor drain respectively, and the single vent that connected to the sink and the lavatory respectively. Black water sewerage pipes used 3-4 inches PVC, while the grey water sewerages used 1 ½ - 2 ½ inches PVC, and vent used pipe 2-4 inches PVC.
Perencanaan Sistem Plambing Air Buangan Gedung Rusunawa Mahasiswa Universitas Andalas
Komala, Puti Sri (author) / Abuzar, Suarni S. (author) / Dewi, Purnama Mentari (author)
2019-09-19
Jurnal Serambi Engineering; Vol 4: No. Edisi Khusus (Oktober 2019) ; 2541-1934 ; 2528-3561 ; 10.32672/jse.v4i2
Article (Journal)
Electronic Resource
English
DDC:
690
PERENCANAAN STRUKTUR BANGUNAN ATAS GEDUNG RUSUNAWA UNIVERSITAS LANCANG KUNING
DOAJ | 2017
|PROJECT PLANNING AND CONTROLLING GEDUNG RUSUNAWA UNIVERSITAS INDONESIA DENGAN MS.PROJECT
DOAJ | 2016
|STUDI ALTERNATIF PERENCANAAN DENGAN METODE KOMPOSIT GEDUNG FISIP UNIVERSITAS MUHAMMADIYAH SIDOARJO
BASE | 2020
|BASE | 2021
|Perencanaan Konsep Konservasi Air Gedung Universitas Swasta di Wilayah Utara Kota Bandung
DOAJ | 2020
|