ANALISIS EVALUASI BIAYA DAN PENJADWALAN WAKTU PROYEK PENGOLAHAN LIMBAH PT. KI DENGAN PENDEKATAN PERT
Development industry now is significant so must be balance with waste treatment. The project waste treatment must be always control, so that the project activities are less effective and efficient, it will result in delays, decreasing the quality of work, and the swelling of implementation costs, one of which is a waste treatment project. This study aims to find out the evaluation of project scheduling and waste processing project cost by Project Evaluation Review Technique (PERT) approach either in manual calculation or POM software assistance. The results obtained that the waste processing project in PT. KI can be completed within 91 days and the critical path lies in the begin activity from A-B-C-E-H-J-K until L with the likelihood of completion of at least 85 days is 2.5%, most likely to be completed 91 days is 95% and no later than 96 days is 2.5%.Keywords: PERT, Scheduling time, cost, waste treatment.
ANALISIS EVALUASI BIAYA DAN PENJADWALAN WAKTU PROYEK PENGOLAHAN LIMBAH PT. KI DENGAN PENDEKATAN PERT
Development industry now is significant so must be balance with waste treatment. The project waste treatment must be always control, so that the project activities are less effective and efficient, it will result in delays, decreasing the quality of work, and the swelling of implementation costs, one of which is a waste treatment project. This study aims to find out the evaluation of project scheduling and waste processing project cost by Project Evaluation Review Technique (PERT) approach either in manual calculation or POM software assistance. The results obtained that the waste processing project in PT. KI can be completed within 91 days and the critical path lies in the begin activity from A-B-C-E-H-J-K until L with the likelihood of completion of at least 85 days is 2.5%, most likely to be completed 91 days is 95% and no later than 96 days is 2.5%.Keywords: PERT, Scheduling time, cost, waste treatment.
ANALISIS EVALUASI BIAYA DAN PENJADWALAN WAKTU PROYEK PENGOLAHAN LIMBAH PT. KI DENGAN PENDEKATAN PERT
Mas’ud, M. Imron (author) / Wijayanti, Erik (author)
2017-05-10
doi:10.31949/j-ensitec.v3i2.644
J-ENSITEC; Vol 3, No 2 (2017): Mei 2017 ; 2477-359X ; 10.31949/j-ensitec.v3i2
Article (Journal)
Electronic Resource
English
DDC:
690
OPTIMALISASI WAKTU DAN BIAYA PROYEK DENGAN METODE CPM DAN PERT DI PROYEK ABC CONDOTEL
BASE | 2021
|Analisis Estimasi Waktu Penyelesaian Proyek Perangkat Lunak Menggunakan Metode PERT
BASE | 2018
|