A platform for research: civil engineering, architecture and urbanism
Lowering Capital Costs when Evaluating Relief Systems - A Collaborative Approach
Presentation ; Continued uncertainty in future oil and gas prices has increased the sensitivity around energy related developments, leading to elevated levels of financial scrutiny. This is making owner- operators and Engineering, Procurement, and Construction (EPC) companies continue to look for smart options to increase their overall project delivery performance in order to maximize the Net Present Value (NPV). Lowering cost of design calls for a more collaborative approach to ensure an effective and prudent design of relief systems. The design of relief systems requires much more than just the proper sizing of the relief devices. During the concept phase of either Greenfield or Brownfield projects, assessing the basis for major relief systems and making clear recommendations to reduce the risks associated with each system has helped companies realize substantial safety and economic benefits. This presentation will give a typical breakdown of the collaborative workflow process for each of the entities involved in the project. Four distinct work activities are typically identified for such a project – development of preliminary overpressure protection, engineering design of relief systems, validation of the design, and validation of as-built documentation. At the end of each stage, the output from the independent analysis is compared with the contractor’s work and updates are performed before continuing to the next stage. This presentation will also give an overview of these stages, discuss the various steps, and the value-added benefit for each stage of the project.
Lowering Capital Costs when Evaluating Relief Systems - A Collaborative Approach
Presentation ; Continued uncertainty in future oil and gas prices has increased the sensitivity around energy related developments, leading to elevated levels of financial scrutiny. This is making owner- operators and Engineering, Procurement, and Construction (EPC) companies continue to look for smart options to increase their overall project delivery performance in order to maximize the Net Present Value (NPV). Lowering cost of design calls for a more collaborative approach to ensure an effective and prudent design of relief systems. The design of relief systems requires much more than just the proper sizing of the relief devices. During the concept phase of either Greenfield or Brownfield projects, assessing the basis for major relief systems and making clear recommendations to reduce the risks associated with each system has helped companies realize substantial safety and economic benefits. This presentation will give a typical breakdown of the collaborative workflow process for each of the entities involved in the project. Four distinct work activities are typically identified for such a project – development of preliminary overpressure protection, engineering design of relief systems, validation of the design, and validation of as-built documentation. At the end of each stage, the output from the independent analysis is compared with the contractor’s work and updates are performed before continuing to the next stage. This presentation will also give an overview of these stages, discuss the various steps, and the value-added benefit for each stage of the project.
Lowering Capital Costs when Evaluating Relief Systems - A Collaborative Approach
Patankar, Aniket (author) / Pineda, Norberto (author) / Garcia Jr., Efrain (author) / Lloyd's Register
2017-01-01
Miscellaneous
Electronic Resource
English
DDC:
690
Online Contents | 1998
Lowering Concrete Costs by Improved Techniques
ASCE | 2021
|Speeding up construction, maintenance and lowering costs
Engineering Index Backfile | 1949
|FAST PAYBACK LOWERING ELECTRIC COSTS AND EMISSIONS
British Library Online Contents | 2008
Lowering Operating Costs: Energy-Efficient Glazing Basics
British Library Online Contents | 2009