Fire Safe implementation of visible mass timber in tall buildings – compartment fire testing
Five real scale fire tests of compartments constructed of cross-laminated timber (CLT) and glued laminated timber, compliant with product standards specified in current US model building code, were performed. Four of the tested compartments were designed to result in a representative and severe fire scenario in a residential fire compartment, using a probabilistic approach. The other tested compartment had additional openings and a greater opening factor, which was aimed to be representative of buildings designed for business occupancy. The interior of the compartments had surface areas of exposed mass timber that varied from approximately the area of the floor plan to approximately two times the area of the floor plan. The tests included measurements to study the internal compartment exposure, the temperature development at gypsum protected surfaces, the temperature development in the structural timber, oxygen concentrations at locations of interest and exposure to exterior surfaces of the wall and façade above the openings. The fire in the compartment with a greater opening factor had two layers of fire-rated gypsum board protection on the back wall and all other surfaces of CLT and glued laminated timber exposed. Despite having the highest peak combustion rate, this compartment fire had the least severe internal and external fire exposure. The fire decayed relatively quickly after flashover and continued to decay until the test was stopped at 4 hours after ignition. This fire resulted in less structural damage than the fires in compartments with fewer and smaller openings. The compartments with fewer and smaller openings had similar temperatures for approximately the first 10 minutes after flashover. The compartment with only the ceiling (including the glued laminated timber beam) exposed started to decay after 22 minutes of post-flashover fire and continued to decay until the end of the test at 4 hours after ignition. The other three tests had, in addition to the ceiling, significant areas of exposed wall ...
Fire Safe implementation of visible mass timber in tall buildings – compartment fire testing
Five real scale fire tests of compartments constructed of cross-laminated timber (CLT) and glued laminated timber, compliant with product standards specified in current US model building code, were performed. Four of the tested compartments were designed to result in a representative and severe fire scenario in a residential fire compartment, using a probabilistic approach. The other tested compartment had additional openings and a greater opening factor, which was aimed to be representative of buildings designed for business occupancy. The interior of the compartments had surface areas of exposed mass timber that varied from approximately the area of the floor plan to approximately two times the area of the floor plan. The tests included measurements to study the internal compartment exposure, the temperature development at gypsum protected surfaces, the temperature development in the structural timber, oxygen concentrations at locations of interest and exposure to exterior surfaces of the wall and façade above the openings. The fire in the compartment with a greater opening factor had two layers of fire-rated gypsum board protection on the back wall and all other surfaces of CLT and glued laminated timber exposed. Despite having the highest peak combustion rate, this compartment fire had the least severe internal and external fire exposure. The fire decayed relatively quickly after flashover and continued to decay until the test was stopped at 4 hours after ignition. This fire resulted in less structural damage than the fires in compartments with fewer and smaller openings. The compartments with fewer and smaller openings had similar temperatures for approximately the first 10 minutes after flashover. The compartment with only the ceiling (including the glued laminated timber beam) exposed started to decay after 22 minutes of post-flashover fire and continued to decay until the end of the test at 4 hours after ignition. The other three tests had, in addition to the ceiling, significant areas of exposed wall ...
Fire Safe implementation of visible mass timber in tall buildings – compartment fire testing
Brandon, Daniel (author) / Sjöström, Johan (author) / Temple, Alastair (author) / Hallberg, Emil (author) / Kahl, Fredrik (author)
2021-01-01
2021:40
Paper
Electronic Resource
English
Fire Safety Concept for Tall Timber Buildings
British Library Conference Proceedings | 2008
|Fire Design Concepts for Tall Timber Buildings
British Library Online Contents | 2008
|Fire Design Concepts for Tall Timber Buildings
Online Contents | 2008
|ROBUSTNESS IN FIRE – POSSIBILITIES FOR TALL TIMBER BUILDINGS
TIBKAT | 2021
|