A platform for research: civil engineering, architecture and urbanism
IMPLEMENTASI METODE ANALYTICAL HIERARCHY PROCESS DALAM PENGELOLAAN DAERAH ALIRAN SUNGAI
This study aims to apply the method of Analytical Hierarchy Process (AHP) to prioritize the management of a watershed that can adopt a variety of stakeholder interests to bring into sustainable DAS management model . Priority weighting method using Analytical Hierarchy Process (AHP) developed by Saaty (2008) . Purpose (Goal) is an integrated watershed management that can adopt the interests of various stakeholders . The criteria used are economic, ecological / environmental , and social . Alternative selected are six namely productivity , income, max discharge and min discharge , erosion , and labor . The result of weighting method using AHP have been known that the top priority of the watershed management purpose is to tackle the issue of maximum discharge/flood (0.322) and after that following the issue of productivity (0,239) . Lowest weight in the workforce (0,031) . The amount of weight above reflects the level of interest of the stakeholders involved in watershed management .
IMPLEMENTASI METODE ANALYTICAL HIERARCHY PROCESS DALAM PENGELOLAAN DAERAH ALIRAN SUNGAI
This study aims to apply the method of Analytical Hierarchy Process (AHP) to prioritize the management of a watershed that can adopt a variety of stakeholder interests to bring into sustainable DAS management model . Priority weighting method using Analytical Hierarchy Process (AHP) developed by Saaty (2008) . Purpose (Goal) is an integrated watershed management that can adopt the interests of various stakeholders . The criteria used are economic, ecological / environmental , and social . Alternative selected are six namely productivity , income, max discharge and min discharge , erosion , and labor . The result of weighting method using AHP have been known that the top priority of the watershed management purpose is to tackle the issue of maximum discharge/flood (0.322) and after that following the issue of productivity (0,239) . Lowest weight in the workforce (0,031) . The amount of weight above reflects the level of interest of the stakeholders involved in watershed management .
IMPLEMENTASI METODE ANALYTICAL HIERARCHY PROCESS DALAM PENGELOLAAN DAERAH ALIRAN SUNGAI
Gunawan, Gusta (author)
2019-01-23
doi:10.33369/ijts.6.1.91-97
Inersia: Jurnal Teknik Sipil; Vol 6, No 1 (2014); 91-97 ; 2686-5017 ; 2086-9045
Article (Journal)
Electronic Resource
English
DDC:
710
Peran Pemerintah Daerah Provinsi Riau dalam Pengelolaan Daerah Aliran Sungai Siak
DOAJ | 2016
|Peran Pemerintah Daerah Provinsi Riau dalam Pengelolaan Daerah Aliran Sungai Siak
DOAJ | 2016
|Indikator Kinerja dan Peran Stakeholder dalam Pengelolaan Daerah Aliran Sungai (DAS) Lisu
BASE | 2018
|PERGESERAN KEBIJAKAN DAN PARADIGMA BARU DALAM PENGELOLAAN DAERAH ALIRAN SUNGAI DI INDONESIA
BASE | 2011
|