A platform for research: civil engineering, architecture and urbanism
Sequence determining of construction of the offshore wind farm construction applying permutation method
Ranking of work or feasible investments is one of high-importance keys for successful economic development. The share of renewable energy sources in the Lithuanian primary energy supply is on the lowest among EU. Only bio fuel, hydro and wind power can be considered as potential renewable energy sources in Lithuania at present time. Wind energy generation mature technology and comparatively low cost make it promising as an important primary energy source in the nearest future. The aim of this paper is to determine the sequence for the wind turbine construction in the waters of Lithuania. The key criteria set for was determined for the problem solution: area of the territory, water depth, distance to shore, average wind velocity, max power on the area, amount of energy per year, investments and CO2. AHP method is used to estimate criteria weights. The problem was solved applying multi-attribute permutation method. This method allows dealing with qualitative and quantitative as well as with linguistic (verbal) data.
Sequence determining of construction of the offshore wind farm construction applying permutation method
Ranking of work or feasible investments is one of high-importance keys for successful economic development. The share of renewable energy sources in the Lithuanian primary energy supply is on the lowest among EU. Only bio fuel, hydro and wind power can be considered as potential renewable energy sources in Lithuania at present time. Wind energy generation mature technology and comparatively low cost make it promising as an important primary energy source in the nearest future. The aim of this paper is to determine the sequence for the wind turbine construction in the waters of Lithuania. The key criteria set for was determined for the problem solution: area of the territory, water depth, distance to shore, average wind velocity, max power on the area, amount of energy per year, investments and CO2. AHP method is used to estimate criteria weights. The problem was solved applying multi-attribute permutation method. This method allows dealing with qualitative and quantitative as well as with linguistic (verbal) data.
Sequence determining of construction of the offshore wind farm construction applying permutation method
Bagočius, Vygantas (author) / Zavadskas, Edmundas Kazimieras (author) / Turskis, Zenonas (author)
2014-01-01
E&M Economics and management = E&M Ekonomie a management, Liberec : Technická Univerzita v Liberci, 2014, vol. 17, no. 3, p. 50-61 ; ISSN 1212-3609 ; eISSN 2336-5064
Article (Journal)
Electronic Resource
English
DDC:
690
Construction planning for the Greater Gabbard offshore wind farm
British Library Conference Proceedings | 2010
|Offshore Wind Farm Cable Survey
British Library Online Contents | 2006
Construction method of offshore wind power system and offshore wind power system
European Patent Office | 2024
|