Multidimensional Construction Planning and Agile Organized Project Execution?The 5D-PROMPT Method
Although tremendous technological and strategic advances have been developed and implemented in the construction sector in recent years, there is substantial room for improvement in the areas of productivity growth, project performance, and schedule reliability. Thus, the present paper seeks to discover why the currently applied scheduling tools and the latest agile-based project organization approaches have not yet achieved their full potential. A missing interlinkage between the project?s design, cost, and time aspects within the project design phase and its sparse utilization throughout project execution were indicated as the driving contributors responsible for the slow progress in development. To fundamentally change this situation, an extensive and coherent project organization solution is proposed. The key process of this solution utilizes a 5D Building Information Model comprising tight concatenations between the individual model objects and the corresponding construction cost and time effort values. The key dates of a waterfall-based construction process simulation, set during the project planning phase, provide particular information to create a structure for agile organized project execution. The implementation of information feedback loops allows target/actual comparisons and contributes to continual improvements in future planning. A comparative case study was conducted with auspicious results on improvements in the overall project performance, and schedule and cost reliability ; This research was supported by Heinrich Schmid GmbH&Co.KG regarding the cooperative conduction of two construction projects used for the case-study; RIB Software SE, who provided the BIM software platform iTWO Baseline and the site management software OnSite, and Contelos GmbH for the provision of the 3D Building Information Model.
Multidimensional Construction Planning and Agile Organized Project Execution?The 5D-PROMPT Method
Although tremendous technological and strategic advances have been developed and implemented in the construction sector in recent years, there is substantial room for improvement in the areas of productivity growth, project performance, and schedule reliability. Thus, the present paper seeks to discover why the currently applied scheduling tools and the latest agile-based project organization approaches have not yet achieved their full potential. A missing interlinkage between the project?s design, cost, and time aspects within the project design phase and its sparse utilization throughout project execution were indicated as the driving contributors responsible for the slow progress in development. To fundamentally change this situation, an extensive and coherent project organization solution is proposed. The key process of this solution utilizes a 5D Building Information Model comprising tight concatenations between the individual model objects and the corresponding construction cost and time effort values. The key dates of a waterfall-based construction process simulation, set during the project planning phase, provide particular information to create a structure for agile organized project execution. The implementation of information feedback loops allows target/actual comparisons and contributes to continual improvements in future planning. A comparative case study was conducted with auspicious results on improvements in the overall project performance, and schedule and cost reliability ; This research was supported by Heinrich Schmid GmbH&Co.KG regarding the cooperative conduction of two construction projects used for the case-study; RIB Software SE, who provided the BIM software platform iTWO Baseline and the site management software OnSite, and Contelos GmbH for the provision of the 3D Building Information Model.
Multidimensional Construction Planning and Agile Organized Project Execution?The 5D-PROMPT Method
Leicht, David (author) / Castro Fresno, Daniel (author) / Dìaz, Joaquìn (author) / Karl Baier, Christian (author) / Universidad de Cantabria
2020-08-01
doi:10.3390/su12166340
Sustainability 2020, 12(16), 6340
Article (Journal)
Electronic Resource
English
DDC:
690
Multidimensional Construction Planning and Agile Organized Project Execution—The 5D-PROMPT Method
DOAJ | 2020
|Project Risk Identification Methods for Construction Planning and Execution
British Library Conference Proceedings | 2009
|Stringing Construction Planning and Execution Tasks Together for Effective Project Management
Online Contents | 2015
|