Fatigue assessment of the collapsed XXth Century cable-stayed Polcevera Bridge in Genoa
The present paper investigates the combined effect of corrosion and fatigue at very-high number of cycles on the recently collapsed Polcevera Bridge. Since the construction, in the mid-sixties, the viaduct has experienced a dramatic increase in the heavy lorries Polcevera Bridge. Since the construction, in the mid-sixties, the viaduct has experienced a dramatic increase in the heavy lorries traffic. Although the amplitude of stress oscillation in the strands was limited, it is assessed that the number of larger load am- traffic. Although the amplitude of stress oscillation in the strands was limited, it is assessed that the number of larger load am- plitude cycles reached eighty million, out of almost half a billion of total vehicles that crossed the bridge. Due to the aggressive plitude cycles reached eighty million, out of almost half a billion of total vehicles that crossed the bridge. Due to the aggressive environment, the degradation of the bridge has developed much faster than expected. It is likely that, already at the beginning of the environment, the degradation of the bridge has developed much faster than expected. It is likely that, already at the beginning of the Eighties, the effectiveness of the prestressed concrete covering of the strands was vanishing in some sections close to the antenna, Eighties, the effectiveness of the prestressed concrete covering of the strands was vanishing in some sections close to the antenna, both in terms of protection and local stiffness. As a result, the levels of corrosion detected in the strands could have been sufficient both in terms of protection and local stiffness. As a result, the levels of corrosion detected in the strands could have been sufficient to trigger the brittle failure of one of the stay cables, and the subsequent collapse of one of the self-standing structural systems. to trigger the brittle failure of one of the stay cables, and the subsequent collapse of one of the self-standing structural systems. Besides to figure out the possible collapse ...
Fatigue assessment of the collapsed XXth Century cable-stayed Polcevera Bridge in Genoa
The present paper investigates the combined effect of corrosion and fatigue at very-high number of cycles on the recently collapsed Polcevera Bridge. Since the construction, in the mid-sixties, the viaduct has experienced a dramatic increase in the heavy lorries Polcevera Bridge. Since the construction, in the mid-sixties, the viaduct has experienced a dramatic increase in the heavy lorries traffic. Although the amplitude of stress oscillation in the strands was limited, it is assessed that the number of larger load am- traffic. Although the amplitude of stress oscillation in the strands was limited, it is assessed that the number of larger load am- plitude cycles reached eighty million, out of almost half a billion of total vehicles that crossed the bridge. Due to the aggressive plitude cycles reached eighty million, out of almost half a billion of total vehicles that crossed the bridge. Due to the aggressive environment, the degradation of the bridge has developed much faster than expected. It is likely that, already at the beginning of the environment, the degradation of the bridge has developed much faster than expected. It is likely that, already at the beginning of the Eighties, the effectiveness of the prestressed concrete covering of the strands was vanishing in some sections close to the antenna, Eighties, the effectiveness of the prestressed concrete covering of the strands was vanishing in some sections close to the antenna, both in terms of protection and local stiffness. As a result, the levels of corrosion detected in the strands could have been sufficient both in terms of protection and local stiffness. As a result, the levels of corrosion detected in the strands could have been sufficient to trigger the brittle failure of one of the stay cables, and the subsequent collapse of one of the self-standing structural systems. to trigger the brittle failure of one of the stay cables, and the subsequent collapse of one of the self-standing structural systems. Besides to figure out the possible collapse ...
Fatigue assessment of the collapsed XXth Century cable-stayed Polcevera Bridge in Genoa
Invernizzi, Stefano (author) / MONTAGNOLI, FRANCESCO (author) / Carpinteri, Alberto (author) / Invernizzi, Stefano / Montagnoli, Francesco / Carpinteri, Alberto
2019-01-01
Conference paper
Electronic Resource
English
Very High Cycle Corrosion Fatigue Study of the Collapsed Polcevera Bridge, Italy
BASE | 2022
|Remarks on the experimental behaviour of curved surface sliders of the new Polcevera Bridge in Genoa
Taylor & Francis Verlag | 2025
|CABLE-STAYED BRIDGE AND CABLE-STAYED BRIDGE CONSTRUCTION METHOD
European Patent Office | 2020
|