A platform for research: civil engineering, architecture and urbanism
Statybos darbų laiko valdymo sistema ir jos tyrimas ; Construction work time control system and its investigation
Project management methods and algorithms have been analysed in this master paper. Schedule making principles have been considered. Construction work grouping and work time conceptual model and explicit algorithms for two grouping scenarios have been developed. Using project management theory, MS Project COM add-in called SDKG has been developed. This add-in allows the construction supervisor to model the schedule of the object under construction. The add-in has been developed in MS Visual Stuodio 2005 environment using Visual Basic 2005. An investigation to study data retrieval from an estimate, saving, project data deploying and plotting time dependencies on the estimate volume has been carried out. A formula to find the minimal number of mouse clicks depending on the number of works and groups has been derived. The results obtained have been applied in construction companies UAB „Armobetas“ and UAB „Merko statyba“.
Statybos darbų laiko valdymo sistema ir jos tyrimas ; Construction work time control system and its investigation
Project management methods and algorithms have been analysed in this master paper. Schedule making principles have been considered. Construction work grouping and work time conceptual model and explicit algorithms for two grouping scenarios have been developed. Using project management theory, MS Project COM add-in called SDKG has been developed. This add-in allows the construction supervisor to model the schedule of the object under construction. The add-in has been developed in MS Visual Stuodio 2005 environment using Visual Basic 2005. An investigation to study data retrieval from an estimate, saving, project data deploying and plotting time dependencies on the estimate volume has been carried out. A formula to find the minimal number of mouse clicks depending on the number of works and groups has been derived. The results obtained have been applied in construction companies UAB „Armobetas“ and UAB „Merko statyba“.
Statybos darbų laiko valdymo sistema ir jos tyrimas ; Construction work time control system and its investigation
Ringys, Tadas (author) / Slivinskas, Vytautas
2008-06-11
Theses
Electronic Resource
Lithuanian , English
DDC:
690