A platform for research: civil engineering, architecture and urbanism
D4.8 Bornholm Lighthouse UC-4 report
Deliverable 4.8 collects main results and conclusions reached after finalizing modelling, engineering, and equipment development activities preceding to the deployment of the equipment in Use case 4. Use case 4 overarching objective is to demonstrate the operation of a DC microgrid consisting of multiple units. The microgrid is formed by a reconfigurable storage system with an overall energy capacity of 312 kWh, a 61 kW photovoltaic plant, and two 175 kW EV fast charging stations along with a 43 kW connection to the public grid. Detailed objectives of the demonstration focus on assessing the energy management across the different components while minimizing energy losses, increasing therefore the overall system efficiency compared to a traditional system. The capability of the DC microgrid in harvesting more PV production is therefore benchmarked with another identical 61 kW photovoltaic system connected through a traditional DC/AC inverter. Particular focus is given to the specific characterization of the reconfigurable system and its inherent control and optimization, while achieving EV fast charging objectives with locally produced photovoltaic energy and minimal request of power from the public grid. This deliverable provides a general overview of the use case, final architecture, sizing and operation principle of the DC microgrid, detailed description of its energy components, and the environment it will be integrated in. It also collects an extensive set of results and conclusions based on datadriven simulations focused on testing different energy management and control approaches and functions on the system- and on the battery cell level. Results collected in this deliverable are based on scientific papers generated as part of the Insulae project and master thesis projects conducted at the Technical University of Denmark. D4.8 concludes, together with D4.9 (Bornholm Lighthouse Use Case-5 report), the simulation activities in the task T4.3 (Bornholm Lighthouse demonstration preparatory activities) of the ...
D4.8 Bornholm Lighthouse UC-4 report
Deliverable 4.8 collects main results and conclusions reached after finalizing modelling, engineering, and equipment development activities preceding to the deployment of the equipment in Use case 4. Use case 4 overarching objective is to demonstrate the operation of a DC microgrid consisting of multiple units. The microgrid is formed by a reconfigurable storage system with an overall energy capacity of 312 kWh, a 61 kW photovoltaic plant, and two 175 kW EV fast charging stations along with a 43 kW connection to the public grid. Detailed objectives of the demonstration focus on assessing the energy management across the different components while minimizing energy losses, increasing therefore the overall system efficiency compared to a traditional system. The capability of the DC microgrid in harvesting more PV production is therefore benchmarked with another identical 61 kW photovoltaic system connected through a traditional DC/AC inverter. Particular focus is given to the specific characterization of the reconfigurable system and its inherent control and optimization, while achieving EV fast charging objectives with locally produced photovoltaic energy and minimal request of power from the public grid. This deliverable provides a general overview of the use case, final architecture, sizing and operation principle of the DC microgrid, detailed description of its energy components, and the environment it will be integrated in. It also collects an extensive set of results and conclusions based on datadriven simulations focused on testing different energy management and control approaches and functions on the system- and on the battery cell level. Results collected in this deliverable are based on scientific papers generated as part of the Insulae project and master thesis projects conducted at the Technical University of Denmark. D4.8 concludes, together with D4.9 (Bornholm Lighthouse Use Case-5 report), the simulation activities in the task T4.3 (Bornholm Lighthouse demonstration preparatory activities) of the ...
D4.8 Bornholm Lighthouse UC-4 report
Engelhardt, Jan (author) / Gabderakhmanova, Tatiana (author) / Calearo, Lisa (author) / Zepter, Jan Martin Wilhelm (author) / Ledro, Mirko (author) / Marinelli, Mattia (author)
2021-01-01
Engelhardt , J , Gabderakhmanova , T , Calearo , L , Zepter , J M W , Ledro , M & Marinelli , M 2021 , D4.8 Bornholm Lighthouse UC-4 report . Technical University of Denmark .
Book
Electronic Resource
English
DDC:
690
Online Contents | 1994
|UB Braunschweig | 1902
|