Analisa Pengaruh Tingkat Penerapan BIM 5D Terhadap Kinerja Waktu Proyek Konstruksi: BIM, BIM5D, Time, Performance
In construction, risks are usually requests for additional time, cost, or quality of work. Disputes will occur If risks are not resolved properly. In the industrial revolution 4.0, we can use the Building Information Modeling (BIM) method to increase efficiency. BIM is a digital display that contains all information about building elements integrated with the building's life cycle period. BIM will optimize the performance of construction projects. In Indonesia, several consultants/contractors have implemented BIM in construction projects. This study aims to determine and analyze what factors in the process of implementing BIM 5D that affect the performance of construction project time. The research method used is descriptive research method with the Q-method approach using closed survey research instruments to 53 contractor/consultant respondents using BIM. The results obtained from the 5D BIM indicators have 3 effects on the time performance of construction projects. ; Dalam konstruksi, risiko biasanya permintaan untuk tambahan waktu, biaya, atau kualitas pekerjaan. Perselisihan akan terjadi Jika risiko tidak diselesaikan dengan baik. Dalam revolusi industri 4.0, kita dapat menggunakan metode Building Information Modeling (BIM) untuk meningkatkan efisiensi. BIM merupakan tampilan digital yang memuat semua informasi tentang elemen bangunan yang terintegrasi dengan periode siklus hidup bangunan. BIM akan mengoptimalkan kinerja proyek konstruksi. Di Indonesia, beberapa konsultan/kontraktor telah menerapkan BIM dalam proyek konstruksi. Penelitian ini bertujuan untuk mengetahui dan menganalisis faktor-faktor apa saja pada proses penerapan BIM 5D yang berpengaruh terhadap kinerja waktu proyek konstruksi . Metode penelitian yang digunakan adalah metode penelitian deskriptif dengan pendekatan Q-method menggunakan instrumen penelitian closed survey kepada 53 responden kontraktor/konsultan yang menggunakan BIM. Hasil yang diperoleh dari indikator 5D BIM ada 3 berpengaruh terhadap kinerja waktu proyek konstruksi
Analisa Pengaruh Tingkat Penerapan BIM 5D Terhadap Kinerja Waktu Proyek Konstruksi: BIM, BIM5D, Time, Performance
In construction, risks are usually requests for additional time, cost, or quality of work. Disputes will occur If risks are not resolved properly. In the industrial revolution 4.0, we can use the Building Information Modeling (BIM) method to increase efficiency. BIM is a digital display that contains all information about building elements integrated with the building's life cycle period. BIM will optimize the performance of construction projects. In Indonesia, several consultants/contractors have implemented BIM in construction projects. This study aims to determine and analyze what factors in the process of implementing BIM 5D that affect the performance of construction project time. The research method used is descriptive research method with the Q-method approach using closed survey research instruments to 53 contractor/consultant respondents using BIM. The results obtained from the 5D BIM indicators have 3 effects on the time performance of construction projects. ; Dalam konstruksi, risiko biasanya permintaan untuk tambahan waktu, biaya, atau kualitas pekerjaan. Perselisihan akan terjadi Jika risiko tidak diselesaikan dengan baik. Dalam revolusi industri 4.0, kita dapat menggunakan metode Building Information Modeling (BIM) untuk meningkatkan efisiensi. BIM merupakan tampilan digital yang memuat semua informasi tentang elemen bangunan yang terintegrasi dengan periode siklus hidup bangunan. BIM akan mengoptimalkan kinerja proyek konstruksi. Di Indonesia, beberapa konsultan/kontraktor telah menerapkan BIM dalam proyek konstruksi. Penelitian ini bertujuan untuk mengetahui dan menganalisis faktor-faktor apa saja pada proses penerapan BIM 5D yang berpengaruh terhadap kinerja waktu proyek konstruksi . Metode penelitian yang digunakan adalah metode penelitian deskriptif dengan pendekatan Q-method menggunakan instrumen penelitian closed survey kepada 53 responden kontraktor/konsultan yang menggunakan BIM. Hasil yang diperoleh dari indikator 5D BIM ada 3 berpengaruh terhadap kinerja waktu proyek konstruksi
Analisa Pengaruh Tingkat Penerapan BIM 5D Terhadap Kinerja Waktu Proyek Konstruksi: BIM, BIM5D, Time, Performance
santoso, imamsugeng (author) / Suroso, Agus (author) / Amin, Mawardi (author)
2023-06-27
doi:10.31599/jies.v4i1.2389
Journal of Industrial and Engineering System; Vol. 4 No. 1 (2023): Juni 2023; 28-35 ; 2722-7979 ; 10.31599/jies.v4i1
Article (Journal)
Electronic Resource
English
DDC:
690
ANALISA PENGARUH KINERJA MANDOR TERHADAP KUALITAS PROYEK KONSTRUKSI DI KOTA TUBAN
BASE | 2015
PENGARUH MANAJEMEN KOMUNIKASI TERHADAP KINERJA PROYEK KONSTRUKSI DI KOTA MALANG
BASE | 2021
|PENGARUH KINERJA SUMBER DAYA MANUSIA TERHADAP KINERJA PROYEK KONSTRUKSI DI KABUPATEN BADUNG
DOAJ | 2020
|PENGARUH KINERJA SUMBER DAYA MANUSIA TERHADAP KINERJA PROYEK KONSTRUKSI DI KABUPATEN BADUNG
BASE | 2020
|