Applying Interpretive Structural Modeling to Cost Overruns in Construction Projects in the Sultanate of Oman
Cost overruns in construction projects are a problem faced by project managers, engineers, and clients throughout the Middle East. Globally, several studies in the literature have focused on identifying the causes of these overruns and used statistical methods to rank them according to their impacts. None of these studies have considered the interactions among these factors. This paper examines interpretive structural modelling (ISM) as a viable technique for modelling complex interactions among factors responsible for cost overruns in construction projects in the Sultanate of Oman. In particular, thirteen interrelated factors associated with cost overruns were identified, along with their contextual interrelationships. Application of ISM leads to organizing these factors in a hierarchical structure which effectively demonstrates their interactions in a simple way. Four factors were found to be at the root of cost overruns: instability of the US dollar, changes in governmental regulations, faulty cost estimation, and poor coordination among projects’ parties. Taking appropriate actions to minimize the influence of these factors can ultimately lead to better control of future project costs. Thisstudy is of value to managers and decision makers because it provides a powerful yet very easy to apply approach for investigating the problem of cost overruns and other similar issues.
Applying Interpretive Structural Modeling to Cost Overruns in Construction Projects in the Sultanate of Oman
Cost overruns in construction projects are a problem faced by project managers, engineers, and clients throughout the Middle East. Globally, several studies in the literature have focused on identifying the causes of these overruns and used statistical methods to rank them according to their impacts. None of these studies have considered the interactions among these factors. This paper examines interpretive structural modelling (ISM) as a viable technique for modelling complex interactions among factors responsible for cost overruns in construction projects in the Sultanate of Oman. In particular, thirteen interrelated factors associated with cost overruns were identified, along with their contextual interrelationships. Application of ISM leads to organizing these factors in a hierarchical structure which effectively demonstrates their interactions in a simple way. Four factors were found to be at the root of cost overruns: instability of the US dollar, changes in governmental regulations, faulty cost estimation, and poor coordination among projects’ parties. Taking appropriate actions to minimize the influence of these factors can ultimately lead to better control of future project costs. Thisstudy is of value to managers and decision makers because it provides a powerful yet very easy to apply approach for investigating the problem of cost overruns and other similar issues.
Applying Interpretive Structural Modeling to Cost Overruns in Construction Projects in the Sultanate of Oman
Alzebdeh, K. (author) / Bashir, H.A. (author) / Al Siyabi, S.K. (author)
2015-06-01
doi:10.24200/tjer.vol12iss1pp53-68
The Journal of Engineering Research [TJER]; Vol 12, No 1 (2015); 53-68 ; 1726-6742 ; 1726-6009
Article (Journal)
Electronic Resource
English
DDC:
690
Reckoning construction cost overruns in building projects through methodological consequences
Taylor & Francis Verlag | 2022
|Cost Overruns on Federal Capital Territory Authority Road Construction Projects
BASE | 2019
|Factors influencing Time and Cost Overruns on Freeform Construction Projects
Online Contents | 2019
|Factors influencing Time and Cost Overruns on Freeform Construction Projects
Springer Verlag | 2019
|