Kajian Produktivitas Instalasi Rangka Atap Baja Ringan: Studi Kasus di Bandung, Indonesia
The needs of housing in Indonesia is increasing in conjunction with the population growth. This increment has to be addressed by an efficient construction process, which includes an adequate material and construction method selection. The utilization of light steel roof trusses is as an innovation which is considered better in terms of cost, time, and quality, com- pared to a conventional wood roof trusses. This research is aimed to identify the productivity of light steel roof trusses installation. The case study is a housing project in Bandung, which is compared to a historical data from several light steel roof subcontractors within Bandung area. The productivity from the direct observation on the case study is 9.821 m2/man-day, while the historical data processing generates 7.355 m2/man-day. This different is resulted from the ineffective working time. The ineffective working time covers worker’s break time, learning curve, and coordination time. Besides, this different could also be caused by the 7 hours’ assumption on the daily working hour. This assumption is not thoroughly achieved due to several factors which are weather and daily working efficiency. In conclusion the conservative value of the light roof steel trusses installation productivity is 7.355 m2/man-day.
Kajian Produktivitas Instalasi Rangka Atap Baja Ringan: Studi Kasus di Bandung, Indonesia
The needs of housing in Indonesia is increasing in conjunction with the population growth. This increment has to be addressed by an efficient construction process, which includes an adequate material and construction method selection. The utilization of light steel roof trusses is as an innovation which is considered better in terms of cost, time, and quality, com- pared to a conventional wood roof trusses. This research is aimed to identify the productivity of light steel roof trusses installation. The case study is a housing project in Bandung, which is compared to a historical data from several light steel roof subcontractors within Bandung area. The productivity from the direct observation on the case study is 9.821 m2/man-day, while the historical data processing generates 7.355 m2/man-day. This different is resulted from the ineffective working time. The ineffective working time covers worker’s break time, learning curve, and coordination time. Besides, this different could also be caused by the 7 hours’ assumption on the daily working hour. This assumption is not thoroughly achieved due to several factors which are weather and daily working efficiency. In conclusion the conservative value of the light roof steel trusses installation productivity is 7.355 m2/man-day.
Kajian Produktivitas Instalasi Rangka Atap Baja Ringan: Studi Kasus di Bandung, Indonesia
Firdaus, Adrian (author) / Dwi Adianto, Yohanes Lim (author) / Sitompul, Zulkifli B. (author) / Trianto, Antonius (author)
2020-10-27
doi:10.30630/jirs.12.2.376
Jurnal Ilmiah Rekayasa Sipil; Vol 17 No 2 (2020): Edisi Oktober 2020; 106-112 ; 2655-2124 ; 1858-3695
Article (Journal)
Electronic Resource
English
DDC:
690
ANALISIS SAMBUNGAN SEKRUP PADA KONSTRUKSI RANGKA ATAP BAJA RINGAN MENURUT SNI 7971:2013
DOAJ | 2017
|Kajian Eksperimental Peningkatan Kinerja Link Geser pada Sistem Rangka Baja Berpengaku Eksentrik
DOAJ | 2012
|