A platform for research: civil engineering, architecture and urbanism
Gas turbine combined cycle start-up and stress evaluation: A simplified dynamic approach
The main topic of this work is the development and validation of a simplified approach for the dynamic analysis of a Gas Turbine Combined Cycle (GTCC), with a particular focus on start-up procedure and associated mechanical stresses on the steam turbine (ST). The currently deregulated energy market led GTCC to undergo frequent startups, a condition often not considered during plant design. Moreover, the time required for the start-up is crucial under an economical viewpoint, though it is constrained by mechanical stresses imposed to thick components by thermal gradients. The framework proposed in this work aims to improve the accessibility to simulation software by applying commonly used office suite – Microsoft Excel/Visual Basic – with acceptable reduction in accuracy. Simplicity of model allow fast computation and its exploitation can be pursued by non-qualified plant operators. The obtained tool can be than adopted to support decision process during plant operations. The developed tool has been validated for a hot start-up against field measurements supplied by Tirreno Power S.p.A. Italy. Data are recorded through control and monitoring sensors of a 390 MW multi-shaft combined cycle based on the GT AEN94.3 A4 frame, but the results can be easily generalized to other layouts. Simulation result and stress evaluations around the steam turbine (ST) rotor show good agreement with experimental data.
Gas turbine combined cycle start-up and stress evaluation: A simplified dynamic approach
The main topic of this work is the development and validation of a simplified approach for the dynamic analysis of a Gas Turbine Combined Cycle (GTCC), with a particular focus on start-up procedure and associated mechanical stresses on the steam turbine (ST). The currently deregulated energy market led GTCC to undergo frequent startups, a condition often not considered during plant design. Moreover, the time required for the start-up is crucial under an economical viewpoint, though it is constrained by mechanical stresses imposed to thick components by thermal gradients. The framework proposed in this work aims to improve the accessibility to simulation software by applying commonly used office suite – Microsoft Excel/Visual Basic – with acceptable reduction in accuracy. Simplicity of model allow fast computation and its exploitation can be pursued by non-qualified plant operators. The obtained tool can be than adopted to support decision process during plant operations. The developed tool has been validated for a hot start-up against field measurements supplied by Tirreno Power S.p.A. Italy. Data are recorded through control and monitoring sensors of a 390 MW multi-shaft combined cycle based on the GT AEN94.3 A4 frame, but the results can be easily generalized to other layouts. Simulation result and stress evaluations around the steam turbine (ST) rotor show good agreement with experimental data.
Gas turbine combined cycle start-up and stress evaluation: A simplified dynamic approach
Rossi, Iacopo (author) / Sorce, Alessandro (author) / Traverso, Alberto (author) / Rossi, Iacopo / Sorce, Alessandro / Traverso, Alberto
2017-01-01
Article (Journal)
Electronic Resource
English
DDC:
690
Optimization of Start-Up of a Fully Fired Combined-Cycle Plant with GT13E2 Gas Turbine
Springer Verlag | 2016
|Optimization of Start-Up of a Fully Fired Combined-Cycle Plant with GT13E2 Gas Turbine
Online Contents | 2016
|Optimization of Start-Up of a Fully Fired Combined-Cycle Plant with GT13E2 Gas Turbine
Online Contents | 2016
|Increasing Turbine Efficiency at PJSC Mosénergo Combined Cycle Gas Turbine Plants
Springer Verlag | 2023
|The Comprehensive Risk Evaluation for Combined Cycle Gas Turbine Included Wind Power System
British Library Conference Proceedings | 2014
|