A platform for research: civil engineering, architecture and urbanism
Microgrid Demonstration Platform: Modbus TCP/IP Connection for Real-Time Monitoring of a Wind Turbine
Several countries promote wind energy despite their high installation cost, since over time these investments can become profitable. It is important that energy entrepreneurs have up-to-date information of operation parameters, to identify places where excessive energy consumption occurs. For energy management, it is necessary to have an overview of the whole system, such that reporting and further result analysis can be made. With monitoring and control systems, it is possible to enable an improved management of resources, especially in terms of balance between generation and consumption. In this work, it is proposed a graphical interface to monitor and control a wind turbine, in a simulation environment running four operation scenarios. ; The present work was done and funded in the scope of the following projects: H2020 DREAM-GO Project (Marie Sklodowska-Curie grant agreement No 641794); EUREKA - ITEA2 Project SEAS with project number 12004; NETEFFICITY Project (P2020 - 18015); and UID/EEA/00760/2013 funded by FEDER Funds through COMPETE program and by National Funds through FCT.
Microgrid Demonstration Platform: Modbus TCP/IP Connection for Real-Time Monitoring of a Wind Turbine
Several countries promote wind energy despite their high installation cost, since over time these investments can become profitable. It is important that energy entrepreneurs have up-to-date information of operation parameters, to identify places where excessive energy consumption occurs. For energy management, it is necessary to have an overview of the whole system, such that reporting and further result analysis can be made. With monitoring and control systems, it is possible to enable an improved management of resources, especially in terms of balance between generation and consumption. In this work, it is proposed a graphical interface to monitor and control a wind turbine, in a simulation environment running four operation scenarios. ; The present work was done and funded in the scope of the following projects: H2020 DREAM-GO Project (Marie Sklodowska-Curie grant agreement No 641794); EUREKA - ITEA2 Project SEAS with project number 12004; NETEFFICITY Project (P2020 - 18015); and UID/EEA/00760/2013 funded by FEDER Funds through COMPETE program and by National Funds through FCT.
Microgrid Demonstration Platform: Modbus TCP/IP Connection for Real-Time Monitoring of a Wind Turbine
Filipe Sousa (author) / João Spínola (author) / Krzysztof Zawiślak (author) / Pedro Faria (author) / Zita Vale (author)
2017-03-30
Conference paper
Electronic Resource
English
DDC:
690
BASE | 2017
|Motor management system includes Modbus capability
Online Contents | 2015