การวิเคราะห์ระยะเวลาคืนทุนต้นแบบโรงงานรีไซเคิลคอนกรีต: Payback Period of a Concrete Recycling Plant
At present, due to the growing economic conditions, Thailand has an increased amount of building construction or demolition of buildings that generates construction waste. The purpose of this research is to design a suitable logistics management system for construction waste recycling by quantifying the amount of waste generated in each area and designing a concrete waste recycling plant that is suitable for the quantity in that area, by analyzing cost and estimating the payback period of the concrete waste recycling plant. The sample study area was selected as Nakhon Pathom Province. The study found that the amount of concrete waste obtained from Nakhon Pathom Province produced 116.52 tons/day of concrete waste from construction and 148.33 tons/day of estimated concrete waste from demolition. By using the efficiency of waste recycling about 20-35 percent for economic analysis, two sample factory sizes were analyzed, and it was found that a medium-sized factory with a recycling efficiency of 7 tons/hr was more suitable because it provided a faster payback period. However, a medium-sized factory could cover less area. บทคัดย่อ ในปัจจุบันเนื่องจากสภาพเศรษฐกิจที่เติบโตขึ้น ประเทศไทยมีการก่อสร้างอาคาร และการรื้อถอนโครงสร้างอาคารที่ทำให้เกิดขยะจากงานก่อสร้างมากขึ้น งานวิจัยนี้มีจุดประสงค์เพื่อออกแบบการจัดการขยะที่เกิดจากงานก่อสร้างด้วยระบบโลจิสติกส์ที่เหมาะสมสำหรับการจัดการรีไซเคิลขยะจากงานก่อสร้าง โดยการประมาณค่าปริมาณการเกิดขยะคอนกรีตในแต่ละพื้นที่ และออกแบบโรงงานสำหรับรีไซเคิลขยะคอนกรีตที่เหมาะสมกับปริมาณขยะของพื้นที่นั้นๆ โดยวิเคราะห์จากต้นทุนการก่อสร้างและหาระยะเวลาคืนทุนของ โรงงานรีไซเคิลขยะคอนกรีต โดยตัวอย่างพื้นที่ศึกษาจะเลือกเป็นพื้นที่จังหวัดนครปฐม จากการศึกษาพบว่าปริมาณขยะคอนกรีตที่ได้จากพื้นที่จังหวัดนครปฐม เกิดการผลิตขยะคอนกรีตจากงานก่อสร้าง 116.52 ตัน/วัน และขยะคอนกรีตที่ประเมินได้จากงานรื้อถอนสิ่งก่อสร้าง 148.33 ตัน/วัน และจากการคาดการณ์ประสิทธิภาพการนำขยะมารีไซเคิลให้ประมาณเท่ากับ 25 ถึง 35 เปอร์เซ็นต์ ในด้านการวิเคราะห์ทางเศรษฐศาสตร์ของโรงงานรูปแบบตัวอย่างสองขนาด ...
การวิเคราะห์ระยะเวลาคืนทุนต้นแบบโรงงานรีไซเคิลคอนกรีต: Payback Period of a Concrete Recycling Plant
At present, due to the growing economic conditions, Thailand has an increased amount of building construction or demolition of buildings that generates construction waste. The purpose of this research is to design a suitable logistics management system for construction waste recycling by quantifying the amount of waste generated in each area and designing a concrete waste recycling plant that is suitable for the quantity in that area, by analyzing cost and estimating the payback period of the concrete waste recycling plant. The sample study area was selected as Nakhon Pathom Province. The study found that the amount of concrete waste obtained from Nakhon Pathom Province produced 116.52 tons/day of concrete waste from construction and 148.33 tons/day of estimated concrete waste from demolition. By using the efficiency of waste recycling about 20-35 percent for economic analysis, two sample factory sizes were analyzed, and it was found that a medium-sized factory with a recycling efficiency of 7 tons/hr was more suitable because it provided a faster payback period. However, a medium-sized factory could cover less area. บทคัดย่อ ในปัจจุบันเนื่องจากสภาพเศรษฐกิจที่เติบโตขึ้น ประเทศไทยมีการก่อสร้างอาคาร และการรื้อถอนโครงสร้างอาคารที่ทำให้เกิดขยะจากงานก่อสร้างมากขึ้น งานวิจัยนี้มีจุดประสงค์เพื่อออกแบบการจัดการขยะที่เกิดจากงานก่อสร้างด้วยระบบโลจิสติกส์ที่เหมาะสมสำหรับการจัดการรีไซเคิลขยะจากงานก่อสร้าง โดยการประมาณค่าปริมาณการเกิดขยะคอนกรีตในแต่ละพื้นที่ และออกแบบโรงงานสำหรับรีไซเคิลขยะคอนกรีตที่เหมาะสมกับปริมาณขยะของพื้นที่นั้นๆ โดยวิเคราะห์จากต้นทุนการก่อสร้างและหาระยะเวลาคืนทุนของ โรงงานรีไซเคิลขยะคอนกรีต โดยตัวอย่างพื้นที่ศึกษาจะเลือกเป็นพื้นที่จังหวัดนครปฐม จากการศึกษาพบว่าปริมาณขยะคอนกรีตที่ได้จากพื้นที่จังหวัดนครปฐม เกิดการผลิตขยะคอนกรีตจากงานก่อสร้าง 116.52 ตัน/วัน และขยะคอนกรีตที่ประเมินได้จากงานรื้อถอนสิ่งก่อสร้าง 148.33 ตัน/วัน และจากการคาดการณ์ประสิทธิภาพการนำขยะมารีไซเคิลให้ประมาณเท่ากับ 25 ถึง 35 เปอร์เซ็นต์ ในด้านการวิเคราะห์ทางเศรษฐศาสตร์ของโรงงานรูปแบบตัวอย่างสองขนาด ...
การวิเคราะห์ระยะเวลาคืนทุนต้นแบบโรงงานรีไซเคิลคอนกรีต: Payback Period of a Concrete Recycling Plant
ศุภนัตร์, ไพศาล (author) / จันทรโชติ, กฤษณะ (author) / ทองชาติ, สิรัญญา (author) / กสิกิจวิวัฒน์, ปนัดดา (author)
2023-12-26
วารสารวิทยาศาสตร์และเทคโนโลยี มหาวิทยาลัยเกษตรศาสตร์; Vol. 12 No. 3 (2566): กันยายน - ธันวาคม (Sep. - Dec. 2023); 1-11 ; 3027-6209 ; 3027-6179
Article (Journal)
Electronic Resource
English
DDC:
690
DEPARTMENTS - Editorial - + Payback
Online Contents | 2001
Forecast on Payback Period of Restaurant Projects Investment by Computer Simulation
British Library Conference Proceedings | 2012
|ECONOMICS & SPECIFIER: Sustainability: What's the payback period for renewable energy generators?
Online Contents | 2010
|Payback Period for Emissions Abatement Alternatives: Role of Regulation and Fuel Prices
British Library Online Contents | 2016
|