A platform for research: civil engineering, architecture and urbanism
Large scale fire tests with different types of fixed fire fighting systems in Runehamar tunnel
The report presents the main results of the six large-scale tests with different types of fixed firefighting system (FFFS) that were carried out in the Runehamar tunnel in June 2016. It describes the background to the tests and the performance of the different systems, and draws conclusions regarding the efficiency of the systems. The fire load consisted of 420 standardised wooden pallets and a target of 21 wooden pallets. Five of the tests were carried out with a 30 mlong deluge zone delivering varying water densities using three different types of side-wall nozzle and an interval distance of 5 m. One test with 93°C glass-bulb nozzles (sprinkler head) in the same zone was also conducted. In the five deluge tests, the detection system was simulated using thermocouples in the tunnel ceiling. The alarm was registered when the ceiling gas temperature reached 141°C, and the system was activated manually after a delay of 4 minutes. The protection goal of the system was to prevent fire spread to a target positioned 5 m from the rear of the main fuel area, and to ensure that the fire did not exceed 30 MW in size. The system setups tested were found to meet these goals.
Large scale fire tests with different types of fixed fire fighting systems in Runehamar tunnel
The report presents the main results of the six large-scale tests with different types of fixed firefighting system (FFFS) that were carried out in the Runehamar tunnel in June 2016. It describes the background to the tests and the performance of the different systems, and draws conclusions regarding the efficiency of the systems. The fire load consisted of 420 standardised wooden pallets and a target of 21 wooden pallets. Five of the tests were carried out with a 30 mlong deluge zone delivering varying water densities using three different types of side-wall nozzle and an interval distance of 5 m. One test with 93°C glass-bulb nozzles (sprinkler head) in the same zone was also conducted. In the five deluge tests, the detection system was simulated using thermocouples in the tunnel ceiling. The alarm was registered when the ceiling gas temperature reached 141°C, and the system was activated manually after a delay of 4 minutes. The protection goal of the system was to prevent fire spread to a target positioned 5 m from the rear of the main fuel area, and to ensure that the fire did not exceed 30 MW in size. The system setups tested were found to meet these goals.
Large scale fire tests with different types of fixed fire fighting systems in Runehamar tunnel
Ingason, Haukur (author) / Li, Ying Zhen (author) / Bobert, Magnus (author)
2016-01-01
Paper
Electronic Resource
English
DDC:
690
Large Scale Tunnel Fire Tests with Large Droplet Water-Based Fixed Fire Fighting System
British Library Online Contents | 2016
|European Tunnel Fire Research: Large-Scale Tunnel Fire Tests in Runehamar Tunnel, Norway
British Library Conference Proceedings | 2005
|Fighting a stubborn tunnel fire
Engineering Index Backfile | 1914
Research on Fire Disaster Fire-Fighting Simulation System of Large-Long Tunnel
Trans Tech Publications | 2012
|