A simple demand-side management solution for a typical compressed-air system at a South African gold mine
Once designed, mine compressed-air systems tend to operate at peak levels throughout the life of the mine, despite there being significant periods when this air quantity is not required. This is mainly due to lack of appropriate compressor controls. Consequently, such compressed-air systems are inefficient and wasteful. A compressed-air system at a South African gold mine was retrofitted with an automatic compressor control system featuring compressor cascading and pressure bandwidth control. The goal was to implement a simple demand-side management (DSM) strategy to afford meaningful electrical energy savings. The automatic control strategy realised a saving of 1.25 MW (on a baseline of 7.22 MW) during Eskom’s evening peak demand window. This represents a reduction of 17.3% in electrical power consumption during the evening peak period, and savings of nearly R2.9 million per year.
A simple demand-side management solution for a typical compressed-air system at a South African gold mine
Once designed, mine compressed-air systems tend to operate at peak levels throughout the life of the mine, despite there being significant periods when this air quantity is not required. This is mainly due to lack of appropriate compressor controls. Consequently, such compressed-air systems are inefficient and wasteful. A compressed-air system at a South African gold mine was retrofitted with an automatic compressor control system featuring compressor cascading and pressure bandwidth control. The goal was to implement a simple demand-side management (DSM) strategy to afford meaningful electrical energy savings. The automatic control strategy realised a saving of 1.25 MW (on a baseline of 7.22 MW) during Eskom’s evening peak demand window. This represents a reduction of 17.3% in electrical power consumption during the evening peak period, and savings of nearly R2.9 million per year.
A simple demand-side management solution for a typical compressed-air system at a South African gold mine
Liebenberg, Leon (author) / Velleman, Douglas (author) / Booysen, Walter (author)
2012-05-01
doi:10.17159/2413-3051/2012/v23i2a3159
Journal of Energy in Southern Africa; Vol. 23 No. 2 (2012): Journal of Energy in Southern Africa. May; 20-29 ; 2413-3051 ; 1021-447X
Article (Journal)
Electronic Resource
English
DDC:
690
Demand-Side Management through thermal efficiency in South African houses
Online Contents | 1999
|Do South African cities need travel demand management?
British Library Conference Proceedings | 1997
|A pillar preconditioning experiment on a deep-level South African gold mine
British Library Conference Proceedings | 1996
|Case study of a large seismic event at a South African gold mine
British Library Conference Proceedings | 1999
|Uranium Demand Rekindles South African Operations
Online Contents | 2015
|