A platform for research: civil engineering, architecture and urbanism
From waste management to component management in the construction industry
The construction industry uses more resources and produces more waste than any other industrial sector; sustainable development depends on the reduction of both, while providing for a growing global population. The reuse of existing building components could support this goal. However, it is difficult to reclaimcomponents from demolition, and materials remain cheap compared with labour, so new approaches are needed for reuse to be implemented beyond niche projects. This study therefore reviews waste interventions. Multiple case studies, spanning new builds and refurbishment, were undertaken to examine systemic mechanisms that lead to components being discarded. Evidence from fieldwork observations, waste documentation, and interviews indicates that the generators of unwanted components effectively decide their fate, and a failure to identify components in advance, uncertainty over usefulness, the perception of cost and programme risk in reclamation, and the preferential order of the waste hierarchy mean that the decision to discard to waste management goes unchallenged. A triage process is proposed to capture timely information about existing building components to be discarded, make this information visible to a wide community, and determine usefulness by focusing creativity already present in the industry on an exhaustive examination of component reusability and upcyclability.
From waste management to component management in the construction industry
The construction industry uses more resources and produces more waste than any other industrial sector; sustainable development depends on the reduction of both, while providing for a growing global population. The reuse of existing building components could support this goal. However, it is difficult to reclaimcomponents from demolition, and materials remain cheap compared with labour, so new approaches are needed for reuse to be implemented beyond niche projects. This study therefore reviews waste interventions. Multiple case studies, spanning new builds and refurbishment, were undertaken to examine systemic mechanisms that lead to components being discarded. Evidence from fieldwork observations, waste documentation, and interviews indicates that the generators of unwanted components effectively decide their fate, and a failure to identify components in advance, uncertainty over usefulness, the perception of cost and programme risk in reclamation, and the preferential order of the waste hierarchy mean that the decision to discard to waste management goes unchallenged. A triage process is proposed to capture timely information about existing building components to be discarded, make this information visible to a wide community, and determine usefulness by focusing creativity already present in the industry on an exhaustive examination of component reusability and upcyclability.
From waste management to component management in the construction industry
Rose, CM (author) / Stegemann, JA (author)
2018-01-01
Sustainability , 10 (1) , Article 229. (2018)
Article (Journal)
Electronic Resource
English
DDC:
690
From Waste Management to Component Management in the Construction Industry
DOAJ | 2018
|Waste management in the construction industry
British Library Conference Proceedings | 1998
|Materials waste management in Singapore construction industry
British Library Conference Proceedings | 2003
|Perception on benefits of construction waste management in the Singapore construction industry
Online Contents | 2011
|Perception on benefits of construction waste management in the Singapore construction industry
Emerald Group Publishing | 2011
|