Management of ASR affected spillway structures at Kafue Gorge, Zambia
The Kafue Gorge dam along Kafue River in Zambia was commissioned in 1971. In 1988 one of the spillway gates was jammed due to concrete expansion. Measures were taken, but signs of expansion and cracking continued. After rehabilitation works on one of the spillway gates in 2011 five stop-logs were stuck in position due to concrete expansion. In 2012, ZESCO and SWECO performed an in-depth assessment of the spillway structure with crack mapping and core sampling. Extensive cracking on the upstream side of the spillway piers with crack widths of up to 30 mm was found under water. Concrete analysis verified ongoing ASR. Numerical simulations on the behavior of the dam (with major cracks and ASR-expansion) showed that there was a need for stabilizing measures. SWECO designed remedial measures to restore full integrity of the dam and resolve the problem with the jammed stop-logs that caused reduced discharge capacity. During 2019 post-tensioned tendons are installed to ensure a monolithic behavior of the structure and improve the stability. All major cracks will be sealed to reduce the contact area of concrete and water. Finally, the jammed stop-logs will be removed to restore the discharge capacity of the spillway. ; QC 20191022 Part of ISBN 978-0-367-33422-2
Management of ASR affected spillway structures at Kafue Gorge, Zambia
The Kafue Gorge dam along Kafue River in Zambia was commissioned in 1971. In 1988 one of the spillway gates was jammed due to concrete expansion. Measures were taken, but signs of expansion and cracking continued. After rehabilitation works on one of the spillway gates in 2011 five stop-logs were stuck in position due to concrete expansion. In 2012, ZESCO and SWECO performed an in-depth assessment of the spillway structure with crack mapping and core sampling. Extensive cracking on the upstream side of the spillway piers with crack widths of up to 30 mm was found under water. Concrete analysis verified ongoing ASR. Numerical simulations on the behavior of the dam (with major cracks and ASR-expansion) showed that there was a need for stabilizing measures. SWECO designed remedial measures to restore full integrity of the dam and resolve the problem with the jammed stop-logs that caused reduced discharge capacity. During 2019 post-tensioned tendons are installed to ensure a monolithic behavior of the structure and improve the stability. All major cracks will be sealed to reduce the contact area of concrete and water. Finally, the jammed stop-logs will be removed to restore the discharge capacity of the spillway. ; QC 20191022 Part of ISBN 978-0-367-33422-2
Management of ASR affected spillway structures at Kafue Gorge, Zambia
Nordström, Erik (author) / Tornberg, Robert (author) / Kamanga, Romas (author)
2019-01-01
Conference paper
Electronic Resource
English
DDC:
500
Geotechnical Studies of Spillway at Kafue Gorge Dam: A Case Study
British Library Conference Proceedings | 1999
|Kafue Gorge hydroelectric power project - Part 2
Tema Archive | 1972
|Management of aquatic weeds on the Kafue river in Zambia
British Library Conference Proceedings | 2001
|Approaches to integrated water resource development and management of the Kafue Basin, Zambia
British Library Conference Proceedings | 1994
|