A platform for research: civil engineering, architecture and urbanism
Bankable procedures for the technical quality assurance of large scale PV plants
Strict technical quality assurance procedures are essential for PV plant bankability. When large-scale PV plants are concerned, this is typically accomplished in three consecutive phases: an energy yield forecast, that is performed at the beginning of the project and is typically accomplished by means of a simulation exercise performed with dedicated software; a reception test campaign, that is performed at the end of the commissioning and consists of a set of tests for determining the efficiency and the reliability of the PV plant devices; and a performance analysis of the first years of operation, that consists in comparing the real energy production with the one calculated from the recorded operating conditions and taking into account the maintenance records. In the last six years, IES-UPM has offered both indoor and on-site quality control campaigns for more than 60 PV plants, with an accumulated power of more than 300 MW, in close contact with Engineering, Procurement and Construction Contractors and financial entities. This paper presents the lessons learned from such experience.
Bankable procedures for the technical quality assurance of large scale PV plants
Strict technical quality assurance procedures are essential for PV plant bankability. When large-scale PV plants are concerned, this is typically accomplished in three consecutive phases: an energy yield forecast, that is performed at the beginning of the project and is typically accomplished by means of a simulation exercise performed with dedicated software; a reception test campaign, that is performed at the end of the commissioning and consists of a set of tests for determining the efficiency and the reliability of the PV plant devices; and a performance analysis of the first years of operation, that consists in comparing the real energy production with the one calculated from the recorded operating conditions and taking into account the maintenance records. In the last six years, IES-UPM has offered both indoor and on-site quality control campaigns for more than 60 PV plants, with an accumulated power of more than 300 MW, in close contact with Engineering, Procurement and Construction Contractors and financial entities. This paper presents the lessons learned from such experience.
Bankable procedures for the technical quality assurance of large scale PV plants
Martinez Moreno, Francisco (author) / Lorenzo Pigueiras, Eduardo (author) / Moreton Villagra, Rodrigo (author) / Narvarte Fernández, Luis (author)
2014-01-01
29th European Photovoltaic Solar Energy Conference and Exhibition | 29th European Photovoltaic Solar Energy Conference and Exhibition | 22/09/2014 - 26/09/2014 | Amsterdam, Netherlands
Conference paper
Electronic Resource
English
DDC:
690
BANKABLE AND INVESTMENT-READY UNDERGROUND SPACE DEVELOPMENTS
TIBKAT | 2018
|Bankable Feasibility Studies - Five bankers point the way
Online Contents | 1997
Technical papers - Theme: Mumbai-Pune Expresway - Quality assurance and quality control procedures
Online Contents | 2000
|Quality assurance and acceptance procedures
TIBKAT | 1971
|Modeling the impact of uncertainty in emissions trading markets with bankable permits
Springer Verlag | 2012
|