ANALISIS PRODUKTIVITAS TENAGA KERJA PADA PEKERJAAN PLAT LANTAI DENGAN METODE WORK SAMPLING
Slab structure work in building construction is a very important job because floor slab work has a large volume.Labor productivity is very important in carrying out a job, the output of the construction sector can be seen from thequantity of work that has been done, while the input is the amount of resources used such as labor. The purpose ofthis study was to determine the amount of labor required for every 1 m2 (OH) and the standard time for laborproductivity in completing 1 m2 of floor slab work. The method of collecting primary data is the source of researchdata obtained directly, such as the number of workers and observation of sampling data, while secondary data isobtained from projects such as working drawings. The data is then processed using Microsoft Excel. This researchis a type of quantitative research with a work sampling method. The results of research on floor slab work in theUdayana University Faculty of Medicine Building Construction project show that the calculation of the volumeof labor per day (OH) requires 0.011 OH masons and 0.011 OH workers and the results of calculating the standardtime to complete 1 m2 of floor slab work is 3.15 minutes/m2 . The Calna Villa project shows that the calculation ofThe volume of labor (OH) requires 0.039 OH masons and 0.039 OH workers and the results of calculating thestandard time to complete 1 m2 of floor slab work is 10.37 minutes/m2.
ANALISIS PRODUKTIVITAS TENAGA KERJA PADA PEKERJAAN PLAT LANTAI DENGAN METODE WORK SAMPLING
Slab structure work in building construction is a very important job because floor slab work has a large volume.Labor productivity is very important in carrying out a job, the output of the construction sector can be seen from thequantity of work that has been done, while the input is the amount of resources used such as labor. The purpose ofthis study was to determine the amount of labor required for every 1 m2 (OH) and the standard time for laborproductivity in completing 1 m2 of floor slab work. The method of collecting primary data is the source of researchdata obtained directly, such as the number of workers and observation of sampling data, while secondary data isobtained from projects such as working drawings. The data is then processed using Microsoft Excel. This researchis a type of quantitative research with a work sampling method. The results of research on floor slab work in theUdayana University Faculty of Medicine Building Construction project show that the calculation of the volumeof labor per day (OH) requires 0.011 OH masons and 0.011 OH workers and the results of calculating the standardtime to complete 1 m2 of floor slab work is 3.15 minutes/m2 . The Calna Villa project shows that the calculation ofThe volume of labor (OH) requires 0.039 OH masons and 0.039 OH workers and the results of calculating thestandard time to complete 1 m2 of floor slab work is 10.37 minutes/m2.
ANALISIS PRODUKTIVITAS TENAGA KERJA PADA PEKERJAAN PLAT LANTAI DENGAN METODE WORK SAMPLING
Widnyana, I Nyoman Suta (author) / Mahendra, I Putu Agus Ari (author)
2023-10-30
doi:10.32795/widyateknik.v19i1.4478
Widya Teknik; Vol 19 No 1 (2023): Widya Teknik; 29-34 ; 3026-5363 ; 10.32795/widyateknik.v19i1
Article (Journal)
Electronic Resource
English
DDC:
690
IDENTIFIKASI FAKTOR YANG MEMPENGARUHI PRODUKTIVITAS TENAGA KERJA WANITA PADA PEKERJAAN KONSTRUKSI
BASE | 2018
|PRODUKTIVITAS TENAGA KERJA DENGAN METODE WORK SAMPLING PROYEK PERUMAHAN DI KOTA PEKANBARU
DOAJ | 2017
|BASE | 2015
|