A platform for research: civil engineering, architecture and urbanism
The Risk Assessment of Dam Construction Projects Using Fuzzy TOPSIS (Case Study: Alavian Earth Dam)
One of the appropriate tools for conducting a successful project is the risk management during the implementation of the project. Dam construction projects are complex projects with high impact factors such as variable and uncertain conditions. To identify the risks of project, experts' experiences and comments including mind storm and consultation sessions were used. Risk analysis is a complex issue. Therefore, in this paper, the fuzzy multiple criteria decision making (FMCDM) technique was used to rank the risk which is a powerful and effective tool in solving complex problems under uncertain and implicit conditions. Due to the uncertainty in the language, fuzzy data were used for the quantitative analysis of the probability and severity of effects and the repetition of risks taken into account. The present research was conducted on Alavian dam in the northeast of Iran. Due to the result of the study, design mistakes' risk (R4) has the highest level of risk and earthquake, etc. has the lowest level of risk in Alavian dam project.
The Risk Assessment of Dam Construction Projects Using Fuzzy TOPSIS (Case Study: Alavian Earth Dam)
One of the appropriate tools for conducting a successful project is the risk management during the implementation of the project. Dam construction projects are complex projects with high impact factors such as variable and uncertain conditions. To identify the risks of project, experts' experiences and comments including mind storm and consultation sessions were used. Risk analysis is a complex issue. Therefore, in this paper, the fuzzy multiple criteria decision making (FMCDM) technique was used to rank the risk which is a powerful and effective tool in solving complex problems under uncertain and implicit conditions. Due to the uncertainty in the language, fuzzy data were used for the quantitative analysis of the probability and severity of effects and the repetition of risks taken into account. The present research was conducted on Alavian dam in the northeast of Iran. Due to the result of the study, design mistakes' risk (R4) has the highest level of risk and earthquake, etc. has the lowest level of risk in Alavian dam project.
The Risk Assessment of Dam Construction Projects Using Fuzzy TOPSIS (Case Study: Alavian Earth Dam)
Shaffiee Haghshenas, Sina (author) / Lashteh Neshaei, Mir Ahmad (author) / Pourkazem, Pouyan (author) / Shaffiee Haghshenas, Sami (author)
2016-05-07
doi:10.28991/cej-2016-00000022
Civil Engineering Journal; Vol 2, No 4 (2016): April; 158-167 ; 2476-3055 ; 2676-6957
Article (Journal)
Electronic Resource
English
DDC:
690
Risk Assessment Using Fuzzy TOPSIS and PRAT for Sustainable Engineering Projects
DOAJ | 2019
|Optimum risk allocation model for construction contracts: fuzzy TOPSIS approach
British Library Online Contents | 2012
|Optimum risk allocation model for construction contracts: fuzzy TOPSIS approach
Online Contents | 2012
|