A platform for research: civil engineering, architecture and urbanism
A case study on solar, wind and hydro energy resource potential of Prizren region in Kosovo
Prizren is a city located in the south part of Kosovo with approximately 90,000 inhabitants and land area of 640 km2. The region is covered with distinct geographical features, that favor penetration and deployment of various forms of renewable energy. Particularly, solar, wind and hydro energy potential are considered to be the most available options here. In this study, the potential of these renewable energy sources and their viability for energy production are evaluated using a computational modeling tool. The potential investment opportunities are analyzed based on a 50-year life time project. The results suggest that integrating renewable energy to the existing energy system will enable Prizren region and partly the entire Kosovo for coping with load fluctuations in energy demand. Also, it is expected that the added renewable energy in the existing energy mix will, in a broad perspective, lead to meet the European Union’s target of accelerated renewable energy penetration by the year 2030, and in turn to reduce the greenhouse gas emission to the environment. ; publishedVersion ; This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
A case study on solar, wind and hydro energy resource potential of Prizren region in Kosovo
Prizren is a city located in the south part of Kosovo with approximately 90,000 inhabitants and land area of 640 km2. The region is covered with distinct geographical features, that favor penetration and deployment of various forms of renewable energy. Particularly, solar, wind and hydro energy potential are considered to be the most available options here. In this study, the potential of these renewable energy sources and their viability for energy production are evaluated using a computational modeling tool. The potential investment opportunities are analyzed based on a 50-year life time project. The results suggest that integrating renewable energy to the existing energy system will enable Prizren region and partly the entire Kosovo for coping with load fluctuations in energy demand. Also, it is expected that the added renewable energy in the existing energy mix will, in a broad perspective, lead to meet the European Union’s target of accelerated renewable energy penetration by the year 2030, and in turn to reduce the greenhouse gas emission to the environment. ; publishedVersion ; This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
A case study on solar, wind and hydro energy resource potential of Prizren region in Kosovo
Sarker, Shiplu (author) / Pecani, Goneta (author) / Vula, Dejon (author) / Gebremedhin, Alemayehu (author)
2020-04-24
cristin:1798856
167 ; E3S Web of Conferences
Article (Journal)
Electronic Resource
English
DDC:
690
A case study on solar, wind and hydro energy resource potential of Prizren region in Kosovo
BASE | 2020
|ILLEGAL CONSTRUCTIONS IN SOCIALLY OWNED LAND IN KOSOVO — PRIZREN
TIBKAT | 2019
|Assessment of the water quality of Lumbardhi river, Prizren (Kosovo)
British Library Online Contents | 2016
|Structural Assessment of Mehmed Pasha Hammam in Prizren, Kosovo
Springer Verlag | 2020
|Structural Assessment of Mehmed Pasha Hammam in Prizren, Kosovo
TIBKAT | 2021
|