Predicting the schedule and cost performance in public school building projects in Taiwan
The Ministry of Education (MOE) of Taiwan invests about NTD 30 billion a year in Public School Building Projects (PSBPs). However, 95% of the PSBPs have been extended and have incurred increased costs. A PSBP performance evaluation and prediction system was established by using the Fuzzy Delphi Method (FDM), association rules and an Artificial Neural Network (ANN). Sixty-two Taiwanese PSBPs were used as the samples, while eleven high correlation factors that influence the project performance of PSBPs were defined, and the reasons leading to the poor project performance were discussed in this study. Moreover, the results of the test cases operated by ANN showed that the accuracy rate for schedule and cost variability predictions can reach 84%. The high accuracy rate indicated the reliability of priority control for high-risk projects in the future. The proposed approach can be provided to clients, design and construction firms, and project managers to understand the project performance in real time and to establish a dynamic tracking review and response measures for improving the overall project satisfaction. First published online 20 December 2021
Predicting the schedule and cost performance in public school building projects in Taiwan
The Ministry of Education (MOE) of Taiwan invests about NTD 30 billion a year in Public School Building Projects (PSBPs). However, 95% of the PSBPs have been extended and have incurred increased costs. A PSBP performance evaluation and prediction system was established by using the Fuzzy Delphi Method (FDM), association rules and an Artificial Neural Network (ANN). Sixty-two Taiwanese PSBPs were used as the samples, while eleven high correlation factors that influence the project performance of PSBPs were defined, and the reasons leading to the poor project performance were discussed in this study. Moreover, the results of the test cases operated by ANN showed that the accuracy rate for schedule and cost variability predictions can reach 84%. The high accuracy rate indicated the reliability of priority control for high-risk projects in the future. The proposed approach can be provided to clients, design and construction firms, and project managers to understand the project performance in real time and to establish a dynamic tracking review and response measures for improving the overall project satisfaction. First published online 20 December 2021
Predicting the schedule and cost performance in public school building projects in Taiwan
Juan, Yi-Kai (author) / Liou, Ling-Er (author)
2022-01-11
doi:10.3846/jcem.2021.15853
Journal of Civil Engineering and Management; Vol 28 No 1 (2022); 51–67 ; 1822-3605 ; 1392-3730
Article (Journal)
Electronic Resource
English
DDC:
690
Predicting the schedule and cost performance in public school building projects in Taiwan
DOAJ | 2021
|Approximately predicting the cost and duration of school reconstruction projects in Taiwan
Online Contents | 2006
|Approximately predicting the cost and duration of school reconstruction projects in Taiwan
Online Contents | 2006
|Approximately predicting the cost and duration of school reconstruction projects in Taiwan
British Library Online Contents | 2006
|Predicting Schedule and Cost Elements' Variation for EPC Projects in Alberta
British Library Conference Proceedings | 2005
|