A platform for research: civil engineering, architecture and urbanism
Investigation of hydropower potential of Şemdinli River Basin
The most important renewable energy source in Turkey is the hydropower. Turkey's geographical location provides important advantages for extensive use of hydropower energy sources. There are many available streams in the country for energy generation, which are mostly unexploited at the moment. Besides, electricity demand has recently increased significantly due to extensive energy use in the country. However, the required energy is mostly imported from foreign countries since it cannot be met by Turkey's own resources. In this paper, the hydropower potential of Şemdinli River, which is a subbasin of Zab Basin, is investigated. During the study, Geographic Information Systems (GIS) and Remote Sensing (RS) methods were utilized. According to preliminary research, one dam was planned in the Şemdinli River Basin. The possible costs of this dam and the estimated amount of annual electric energy were also calculated. For the calculations of the total costs and the total installed power capacity of the dam, Simahpp software was used. Accordingly, the total cost, installed power capacity and total annual electricity of the dam were respectively found as 61,716×106 US$, 42,813 MW and 78,76 GWh
Investigation of hydropower potential of Şemdinli River Basin
The most important renewable energy source in Turkey is the hydropower. Turkey's geographical location provides important advantages for extensive use of hydropower energy sources. There are many available streams in the country for energy generation, which are mostly unexploited at the moment. Besides, electricity demand has recently increased significantly due to extensive energy use in the country. However, the required energy is mostly imported from foreign countries since it cannot be met by Turkey's own resources. In this paper, the hydropower potential of Şemdinli River, which is a subbasin of Zab Basin, is investigated. During the study, Geographic Information Systems (GIS) and Remote Sensing (RS) methods were utilized. According to preliminary research, one dam was planned in the Şemdinli River Basin. The possible costs of this dam and the estimated amount of annual electric energy were also calculated. For the calculations of the total costs and the total installed power capacity of the dam, Simahpp software was used. Accordingly, the total cost, installed power capacity and total annual electricity of the dam were respectively found as 61,716×106 US$, 42,813 MW and 78,76 GWh
Investigation of hydropower potential of Şemdinli River Basin
Çabuk, Nihan Saye (author) / Bakış, R. (author) / Göncü, S. (author) / Gümüşlüoglü, E. (author) / Çabuk, A. (author) / Bakış, Recep (author) / Göncü, Serdar (author) / Çabuk, Alper (author) / Anadolu Üniversitesi, Yer ve Uzay Bilimleri Enstitüsü / Çabuk, Nihan Saye
2014-01-01
1737
Article (Journal)
Electronic Resource
English
NILE BASIN COUNTRIES -- Hydropower potential in Nile Basin
Online Contents | 1994
|Potential for small hydropower development in the Lower Pra River Basin, Ghana
DOAJ | 2020
|Hydropower Potential of the Brahmaputra Basin
British Library Conference Proceedings | 1995
|Balancing Hydropower Development in the Ohio River Basin
NTIS | 1989
|