Secure Water Supply for UBC Vancouver Campus : Final Design Report
The Iron Head Ltd. (IHL) has been contracted with SEEDS (Social Ecological Economic Development Studies) Sustainability Program to work towards a better water supply system. The design includes a 450mm ductile iron water main underneath University Boulevard; two 600mm ductile iron pipe underneath Wesbrook Mall; and two storage tanks that have a total combined volume of 12,600 m3. This report summarizes the design progress and critical outcomes after the preliminary design. Some of the highlights are as follows: total flow in the distribution system is 153 L/s; the highest and lowest pressure in distribution system is at 205.5 psi and 49 psi respectively; the structure system of the concrete storage tank consists of a slab-beam-column system with walls. More details about our design can be found in the attached report. The new cost estimation of the whole project is $15,198,386, which includes $13,923,961 for the storage and auxiliary facility construction, and $1,274,425 for the pipeline replacement. The project construction will commence on May 1st, 2018, and the substantial completion will be achieved on Feb. 12th, 2019, with the full operation coming up on Mar. 26th, 2019. Disclaimer: “UBC SEEDS provides students with the opportunity to share the findings of their studies, as well as their opinions, conclusions and recommendations with the UBC community. The reader should bear in mind that this is a student project/report and is not an official document of UBC. Furthermore readers should bear in mind that these reports may not reflect the current status of activities at UBC. We urge you to contact the research persons mentioned in a report or the SEEDS Coordinator about the current status of the subject matter of a project/report.” ; Applied Science, Faculty of ; Civil Engineering, Department of ; Unreviewed ; Undergraduate
Secure Water Supply for UBC Vancouver Campus : Final Design Report
The Iron Head Ltd. (IHL) has been contracted with SEEDS (Social Ecological Economic Development Studies) Sustainability Program to work towards a better water supply system. The design includes a 450mm ductile iron water main underneath University Boulevard; two 600mm ductile iron pipe underneath Wesbrook Mall; and two storage tanks that have a total combined volume of 12,600 m3. This report summarizes the design progress and critical outcomes after the preliminary design. Some of the highlights are as follows: total flow in the distribution system is 153 L/s; the highest and lowest pressure in distribution system is at 205.5 psi and 49 psi respectively; the structure system of the concrete storage tank consists of a slab-beam-column system with walls. More details about our design can be found in the attached report. The new cost estimation of the whole project is $15,198,386, which includes $13,923,961 for the storage and auxiliary facility construction, and $1,274,425 for the pipeline replacement. The project construction will commence on May 1st, 2018, and the substantial completion will be achieved on Feb. 12th, 2019, with the full operation coming up on Mar. 26th, 2019. Disclaimer: “UBC SEEDS provides students with the opportunity to share the findings of their studies, as well as their opinions, conclusions and recommendations with the UBC community. The reader should bear in mind that this is a student project/report and is not an official document of UBC. Furthermore readers should bear in mind that these reports may not reflect the current status of activities at UBC. We urge you to contact the research persons mentioned in a report or the SEEDS Coordinator about the current status of the subject matter of a project/report.” ; Applied Science, Faculty of ; Civil Engineering, Department of ; Unreviewed ; Undergraduate
Secure Water Supply for UBC Vancouver Campus : Final Design Report
Chen, Zihao (author) / Gu, Enyu (author) / Hu, Jiachen (author) / Han, Mingda (author) / Wu, Chen (author) / Wu, Jiehang (author) / University of British Columbia. Sustainability Office / University of British Columbia. Department of Civil Engineering / University of British Columbia. Campus and Community Planning
2018-04-09
University of British Columbia. CIVL 445
Paper
Electronic Resource
English
DDC:
690
Multimedia Campus, Vancouver Film School
British Library Online Contents | 1996
Multimedia Campus, Vancouver Film School by SITU Design