A platform for research: civil engineering, architecture and urbanism
Factors affecting rework costs in construction
Rework adversely impacts the performance of building projects. In this study, data were analyzed from 788 construction incidents in 40 Spanish building projects to determine the influence of project and managerial characteristics on rework costs. Finally, regression analysis was used to understand the relationship between the contributing factors, and to determine a model for rework prediction.Interestingly, the rework prediction model showed that only the original contract value (OCV) and the project location in relation to the company’s headquarters contribute to the regression model. The Project type, the Type of organization, the Type of contract and the original contract duration (OCD) which represents the magnitude and complexity of a project, were represented by the OCV. This model for rework prediction based on original project conditions enables strategies to be put in place prior to the start of construction, to minimize uncertainties and reduce the impact on project cost and schedule, and thus improve productivity. ; Peer Reviewed ; Postprint (author's final draft)
Factors affecting rework costs in construction
Rework adversely impacts the performance of building projects. In this study, data were analyzed from 788 construction incidents in 40 Spanish building projects to determine the influence of project and managerial characteristics on rework costs. Finally, regression analysis was used to understand the relationship between the contributing factors, and to determine a model for rework prediction.Interestingly, the rework prediction model showed that only the original contract value (OCV) and the project location in relation to the company’s headquarters contribute to the regression model. The Project type, the Type of organization, the Type of contract and the original contract duration (OCD) which represents the magnitude and complexity of a project, were represented by the OCV. This model for rework prediction based on original project conditions enables strategies to be put in place prior to the start of construction, to minimize uncertainties and reduce the impact on project cost and schedule, and thus improve productivity. ; Peer Reviewed ; Postprint (author's final draft)
Factors affecting rework costs in construction
Forcada Matheu, Núria (author) / Gangolells Solanellas, Marta (author) / Casals Casanova, Miquel (author) / Macarulla Martí, Marcel (author) / Universitat Politècnica de Catalunya. Departament d'Enginyeria de Projectes i de la Construcció / Universitat Politècnica de Catalunya. GRIC - Grup de Recerca i Innovació de la Construcció
2017-08-01
Article (Journal)
Electronic Resource
English
Regression model , Àrees temàtiques de la UPC::Enginyeria civil , Indústria de la construcció -- Qualitat , Project characteristics , Building--Economic aspects , Construction , Rework costs , Construction industry--Economic aspects , Construcció -- Aspectes econòmics , Àrees temàtiques de la UPC::Edificació , Enginyeria civil -- Aspectes econòmics , Indústria de la construcció -- Aspectes econòmics , Civil engineering--Economic aspects
DDC:
690
Factors Affecting Rework Costs in Construction
Online Contents | 2017
|Factors Affecting Rework Costs in Construction
ASCE | 2017
|Illustrative Benchmarking Rework and Rework Costs in Swedish Construction Industry
Online Contents | 2002
|Calculating total rework costs in Australian construction projects
Online Contents | 2005
|