A platform for research: civil engineering, architecture and urbanism
Analysis of unlined pressure shafts and tunnels of selected Norwegian hydropower projects
Norwegian hydropower industry has more than 100 years of experiences in constructing more than 4000 km-long unlined pressure shafts and tunnels with maximum static head of 1047 m (equivalent to almost 10.5 MPa) reached at unlined pressure tunnel of Nye Tyin project. Experiences gained from construction and operation of these unlined pressure shafts and tunnels were the foundation to develop design criteria and principles applied in Norway and some other countries. In addition to the confinement criteria, Norwegian state-of-the-art design principle for unlined pressure shaft and tunnel is that the minor principal stress at the location of unlined pressure shaft or tunnel should be more than the water pressure in the shaft or tunnel. This condition of the minor principal stress is prerequisite for the hydraulic jacking/splitting not to occur through joints and fractures in rock mass. Another common problem in unlined pressure shafts and tunnels is water leakage through hydraulically splitted joints or pre-existing open joints. This article reviews some of the first attempts of the use of unlined pressure shaft and tunnel concepts in Norway, highlights major failure cases and two succe ssful cases of significance, applies Norwegian criteria to the cases and reviews and evaluates triggering factors for failure. This article further evaluates detailed engineering geology of failure cases and also assesses common geological features that could have aggravated the failure. The minor principal stress is investigated and quantified along unlined shaft and tunnel alignment of six selected project cases by using three dimensional numerical model. Furthermore, conditions of failure through pre-existing open joints by hydraulic jacking and le akage are assessed by using two-dimensional fluid flow analysis. Finally, both favorable and unfavorable ground conditions required for the applicability of Norwegian confinement criteria in locating the unlined pressure shafts and tunnels for geotectonic environment different from that of Norway are highlighted. ; Analysis of unlined pressure shafts and tunnels of selected Norwegian hydropower projects ; publishedVersion ; 2018 Institute of Rock and Soil Mechanics, Chinese Academy of Sciences. Production and hosting by Elsevier B.V. This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/ licenses/by-nc-nd/4.0/).
Analysis of unlined pressure shafts and tunnels of selected Norwegian hydropower projects
Norwegian hydropower industry has more than 100 years of experiences in constructing more than 4000 km-long unlined pressure shafts and tunnels with maximum static head of 1047 m (equivalent to almost 10.5 MPa) reached at unlined pressure tunnel of Nye Tyin project. Experiences gained from construction and operation of these unlined pressure shafts and tunnels were the foundation to develop design criteria and principles applied in Norway and some other countries. In addition to the confinement criteria, Norwegian state-of-the-art design principle for unlined pressure shaft and tunnel is that the minor principal stress at the location of unlined pressure shaft or tunnel should be more than the water pressure in the shaft or tunnel. This condition of the minor principal stress is prerequisite for the hydraulic jacking/splitting not to occur through joints and fractures in rock mass. Another common problem in unlined pressure shafts and tunnels is water leakage through hydraulically splitted joints or pre-existing open joints. This article reviews some of the first attempts of the use of unlined pressure shaft and tunnel concepts in Norway, highlights major failure cases and two succe ssful cases of significance, applies Norwegian criteria to the cases and reviews and evaluates triggering factors for failure. This article further evaluates detailed engineering geology of failure cases and also assesses common geological features that could have aggravated the failure. The minor principal stress is investigated and quantified along unlined shaft and tunnel alignment of six selected project cases by using three dimensional numerical model. Furthermore, conditions of failure through pre-existing open joints by hydraulic jacking and le akage are assessed by using two-dimensional fluid flow analysis. Finally, both favorable and unfavorable ground conditions required for the applicability of Norwegian confinement criteria in locating the unlined pressure shafts and tunnels for geotectonic environment different from that of Norway are highlighted. ; Analysis of unlined pressure shafts and tunnels of selected Norwegian hydropower projects ; publishedVersion ; 2018 Institute of Rock and Soil Mechanics, Chinese Academy of Sciences. Production and hosting by Elsevier B.V. This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/ licenses/by-nc-nd/4.0/).
Analysis of unlined pressure shafts and tunnels of selected Norwegian hydropower projects
Basnet, Chhatra Bahadur (author) / Panthi, Krishna Kanta (author)
2018-01-01
cristin:1587355
486-512 ; 10 ; Journal of Rock Mechanics and Geotechnical Engineering
Article (Journal)
Electronic Resource
English
DDC:
621
Analysis of unlined pressure shafts and tunnels of selected Norwegian hydropower projects
DOAJ | 2018
|Loss of head in unlined pressure tunnels
Engineering Index Backfile | 1921
|Rock falls in selected Norwegian hydropower tunnels subjected to hydropeaking
British Library Online Contents | 2016
|