A platform for research: civil engineering, architecture and urbanism
Perencanaan Sistem Kelistrikan PLTMH Banjar Dinas Mekar Sari
Abstract - This paper introduces a redesign of Micro Hydro Power Plant (MHPP) in Banjar Dinas Mekar Sari, Panji Village, District of Sukasada, Buleleng Regency, Bali. The MHPP has been operated since 1980 by utilizing waterflow of Tukad Pasut River. Early investigation indicated that there is a reduced production capacity of the MHPP due to lack of maintenance. In addition, the initial design of the MHPP has not adopted the advanced power control systems, resulting in inefficient power production. The introduced design of the new MHPP utilizes a crossflow turbine to accommodate a waterflow rate of 1,32 m3/s and with an effective head of 16 m. The turbine mechanical energy is coupled to a generator by means of a belt coupling system, with a belt length of 3099 mm. The pulley diameter is 750 mm for the turbine side, and it is 149 mm for the generator side. The generator capacity is 185 kVA, 50 Hz, 230/400 V, 1500 rpm, and with an efficiency of 94%. The Electronic Load Controller has a capacity of 180 kW, with 6 ballast loads of 30 kW. The connection from the generator to the transformer uses the NYFGbY underground cable of 4 × 95 mm2, with a length of 69 m. The transformer is a step-up and step-down type with a capacity of 250 kVA. ; Intisari— Artikel ini mengemukakan tentang desain ulang Pembangkit Listrik Tenaga Mikrohidro (PLTMH) di Banjar Dinas Mekar Sari, Desa Panji, Kecamatan Sukasada, Kabupaten Buleleng, Bali. PLTMH tersebut telah beroperasi sejak tahun 1980, dengan memanfaatkan aliran air Sungai Tukad Pasut. Investigasi awal menunjukkan adanya penurunan kapasitas produksi PLTMH karena kurangnya perawatan. Selain itu, desain awal PLTMH tersebut belum mengadopsi sistem kontrol yang modern, sehingga mengakibatkan produksi listrik yang tidak efisien. Rancangan baru untuk PLTMH di Banjar Dinas Mekar Sari menggunakan turbin crossflow untuk mengakomodasi laju aliran air 1,32 m3/detik dan dengan tinggi head efektif 16 m. Energi mekanik turbin dikopel ke generator melalui sistem kopel belt dengan panjang sabuk 3099 mm. Diameter pulley adalah 750 mm untuk sisi turbin, dan 149 mm untuk sisi generator. Kapasitas generator adalah 185 kVA, 50 Hz, 230/400 V, 1500 rpm, dan dengan efisiensi 94%. Electronic Load Controller memiliki kapasitas 180 kW, dengan 6 ballast load 30 kW. Sambungan dari generator ke transformator menggunakan kabel bawah tanah NYFGbY 4 × 95 mm2, dengan panjang 69 m. Transformator berjenis step-up/step-down dengan kapasitas 250 kVA.
Perencanaan Sistem Kelistrikan PLTMH Banjar Dinas Mekar Sari
Abstract - This paper introduces a redesign of Micro Hydro Power Plant (MHPP) in Banjar Dinas Mekar Sari, Panji Village, District of Sukasada, Buleleng Regency, Bali. The MHPP has been operated since 1980 by utilizing waterflow of Tukad Pasut River. Early investigation indicated that there is a reduced production capacity of the MHPP due to lack of maintenance. In addition, the initial design of the MHPP has not adopted the advanced power control systems, resulting in inefficient power production. The introduced design of the new MHPP utilizes a crossflow turbine to accommodate a waterflow rate of 1,32 m3/s and with an effective head of 16 m. The turbine mechanical energy is coupled to a generator by means of a belt coupling system, with a belt length of 3099 mm. The pulley diameter is 750 mm for the turbine side, and it is 149 mm for the generator side. The generator capacity is 185 kVA, 50 Hz, 230/400 V, 1500 rpm, and with an efficiency of 94%. The Electronic Load Controller has a capacity of 180 kW, with 6 ballast loads of 30 kW. The connection from the generator to the transformer uses the NYFGbY underground cable of 4 × 95 mm2, with a length of 69 m. The transformer is a step-up and step-down type with a capacity of 250 kVA. ; Intisari— Artikel ini mengemukakan tentang desain ulang Pembangkit Listrik Tenaga Mikrohidro (PLTMH) di Banjar Dinas Mekar Sari, Desa Panji, Kecamatan Sukasada, Kabupaten Buleleng, Bali. PLTMH tersebut telah beroperasi sejak tahun 1980, dengan memanfaatkan aliran air Sungai Tukad Pasut. Investigasi awal menunjukkan adanya penurunan kapasitas produksi PLTMH karena kurangnya perawatan. Selain itu, desain awal PLTMH tersebut belum mengadopsi sistem kontrol yang modern, sehingga mengakibatkan produksi listrik yang tidak efisien. Rancangan baru untuk PLTMH di Banjar Dinas Mekar Sari menggunakan turbin crossflow untuk mengakomodasi laju aliran air 1,32 m3/detik dan dengan tinggi head efektif 16 m. Energi mekanik turbin dikopel ke generator melalui sistem kopel belt dengan panjang sabuk 3099 mm. Diameter pulley adalah 750 mm untuk sisi turbin, dan 149 mm untuk sisi generator. Kapasitas generator adalah 185 kVA, 50 Hz, 230/400 V, 1500 rpm, dan dengan efisiensi 94%. Electronic Load Controller memiliki kapasitas 180 kW, dengan 6 ballast load 30 kW. Sambungan dari generator ke transformator menggunakan kabel bawah tanah NYFGbY 4 × 95 mm2, dengan panjang 69 m. Transformator berjenis step-up/step-down dengan kapasitas 250 kVA.
Perencanaan Sistem Kelistrikan PLTMH Banjar Dinas Mekar Sari
Yanto, I Putu Eka April (author) / Giriantari, I. A. Dwi (author) / Ariastina, W. G. (author)
2021-03-01
doi:10.24843/MITE.2021.v20i01.P04
Jurnal Teknologi Elektro; Vol 20 No 1 (2021): (Januari - Juni ) Majalah Ilmiah Teknologi Elektro; 37-46 ; Majalah Ilmiah Teknologi Elektro; Vol 20 No 1 (2021): (Januari - Juni ) Majalah Ilmiah Teknologi Elektro; 37-46 ; 2503-2372 ; 1693-2951 ; 10.24843/MITE.2021.v20i01
Article (Journal)
Electronic Resource
English
PENGARUH VARIASI ELEKTRODA TERHADAP KELISTRIKAN SARI KULIT NENAS (ANANAS COMOSUS) SEBAGAI BIOBATERAI
BASE | 2021
|Evaluasi Sistem Pembebanan Sistem Kelistrikan Gedung Fakultas Ekonomi Universitas Lancang Kuning
BASE | 2020
|