A platform for research: civil engineering, architecture and urbanism
Effects in service of the staggered construction of cable-stayed bridges built on temporary supports
Cable-stayed bridges can be rarely built on a single construction stage and staggered construction is commonly used. The effects of this staggered construction are not only economical as they might also play an important role in the structural behaviour in service. Despite of this importance, these effects are rarely included into the definition of the structural response in service. In order to fill this gap, this paper deals with the effects in service of the staggered erection of steel cable-stayed bridges built on temporary supports. To do so, a criterion based on the minimization of the bending energy in terms of stay forces is applied to several cable-stayed bridges. This study shows the importance of the existence of the pylon-deck connection as well as the number and location of both construction joints and temporary supports during staggered erection. ; Peer Reviewed ; Postprint (published version)
Effects in service of the staggered construction of cable-stayed bridges built on temporary supports
Cable-stayed bridges can be rarely built on a single construction stage and staggered construction is commonly used. The effects of this staggered construction are not only economical as they might also play an important role in the structural behaviour in service. Despite of this importance, these effects are rarely included into the definition of the structural response in service. In order to fill this gap, this paper deals with the effects in service of the staggered erection of steel cable-stayed bridges built on temporary supports. To do so, a criterion based on the minimization of the bending energy in terms of stay forces is applied to several cable-stayed bridges. This study shows the importance of the existence of the pylon-deck connection as well as the number and location of both construction joints and temporary supports during staggered erection. ; Peer Reviewed ; Postprint (published version)
Effects in service of the staggered construction of cable-stayed bridges built on temporary supports
2015-01-01
Article (Journal)
Electronic Resource
English
optimization , Algorithm , Àrees temàtiques de la UPC::Enginyeria civil::Materials i estructures::Materials i estructures metàl·liques , cable-stayed bridge , Creep , Ponts atirantats , Simulation , temporary supports , Cable-stayed bridges , Àrees temàtiques de la UPC::Edificació::Tècniques i sistemes constructius , Shrinkage , construction joint , objective service stage
DDC:
690
Effects in Service of the Staggered Construction of Cable-Stayed Bridges Built on Temporary Supports
BASE | 2015
|Effects in Service of the Staggered Construction of Cable-Stayed Bridges Built on Temporary Supports
DOAJ | 2015
|Analysis of the construction process of cable-stayed bridges built on temporary supports
Online Contents | 2012
|Forward Algorithm for the construction control of cable-stayed bridges built on temporary supports
Online Contents | 2012
|