A platform for research: civil engineering, architecture and urbanism
Choice of grouting method for jointed hard rock based on sealing time predictions
This thesis concerns subjects related to the choice of agrouting method in a jointed hard rock mass. By calculating thetotal sealing time to reach the requested sealing level,different grouting methods could be compared and the mostfavourable chosen. A methodology, to calculate the sealing time for differentgrouting methods in different rock masses has been developed.Five main activities are included in the methodology; drilling,grouting, waiting, probing and re-grouting, which to differingdegrees contribute to the total sealing time. In addition, anextra activity, post-grouting, is regarded separately, as thepost-grouting time normally is not included in the totalsealing time. Within the different activities, subjects such asrock mass properties, examination of rock mass, groutingtechnique, grout mix and the different waiting times have beenstudied. In practice, the application of the methodology requiresthat the average time and variance for each activity on a fanlevel is expressed. The times for each activity are then addedtogether to achieve the total time for a fan. After which, thetime for each fan is added over the entire tunnel length tocalculate the total sealing time for a tunnel. E.g. for the grouting activity, joints belonging to agrouting fan are randomly selected from a joint aperturedistribution for the appropriate rock mass. For each joint in afan, distributions are calculated for parameters such asinflow, time and grouting volumes as e.g. sealing time andsealing effect. Then a Monte Carlo simulation based on thesedistributions and for each grouting fan is carried out and theaverage grouting time and variance calculated. To test the methodology, numerical calculations for threegrouting methods and in three rock masses have been carriedout. The most favourable grouting method is defined as themethod which fulfils the requirement in the shortest sealingtime. By analysing the result of the numerical calculations, ithas been shown that other activities besides grouting oftenhave a large impact on the ...
Choice of grouting method for jointed hard rock based on sealing time predictions
This thesis concerns subjects related to the choice of agrouting method in a jointed hard rock mass. By calculating thetotal sealing time to reach the requested sealing level,different grouting methods could be compared and the mostfavourable chosen. A methodology, to calculate the sealing time for differentgrouting methods in different rock masses has been developed.Five main activities are included in the methodology; drilling,grouting, waiting, probing and re-grouting, which to differingdegrees contribute to the total sealing time. In addition, anextra activity, post-grouting, is regarded separately, as thepost-grouting time normally is not included in the totalsealing time. Within the different activities, subjects such asrock mass properties, examination of rock mass, groutingtechnique, grout mix and the different waiting times have beenstudied. In practice, the application of the methodology requiresthat the average time and variance for each activity on a fanlevel is expressed. The times for each activity are then addedtogether to achieve the total time for a fan. After which, thetime for each fan is added over the entire tunnel length tocalculate the total sealing time for a tunnel. E.g. for the grouting activity, joints belonging to agrouting fan are randomly selected from a joint aperturedistribution for the appropriate rock mass. For each joint in afan, distributions are calculated for parameters such asinflow, time and grouting volumes as e.g. sealing time andsealing effect. Then a Monte Carlo simulation based on thesedistributions and for each grouting fan is carried out and theaverage grouting time and variance calculated. To test the methodology, numerical calculations for threegrouting methods and in three rock masses have been carriedout. The most favourable grouting method is defined as themethod which fulfils the requirement in the shortest sealingtime. By analysing the result of the numerical calculations, ithas been shown that other activities besides grouting oftenhave a large impact on the ...
Choice of grouting method for jointed hard rock based on sealing time predictions
Dalmalm, Thomas (author)
2004-01-01
1006
Theses
Electronic Resource
English
DDC:
621
Grouting trials in hard jointed rock - investigation, design and execution
British Library Conference Proceedings | 2005
|Large-Scale Field Investigation of Grouting in Hard Jointed Rock
British Library Conference Proceedings | 2003
|Grouting of jointed rock - A case study
British Library Conference Proceedings | 1993
|Analysis of Penetration Grouting in Jointed Rock Masses
British Library Conference Proceedings | 1998
|