A platform for research: civil engineering, architecture and urbanism
An integrated decision support model based on BWM and fuzzy-VIKOR techniques for contractor selection in construction projects
Sustainable development of any country to some extent depends on successful accomplishment of construction projects, particularly infrastructures. Contractors have a key role in the success of these projects. Hence, the selection of a competent contractor as a complicated and hard decision process has a vital importance in the destiny of any construction project. Contractor selection is in essence a multicriteria decision-making that ought to encompass so many aspects of the project and the client’s requirements on one hand and the capabilities and past records of the contractors on the other hand. Failure in selecting a competent contractor may cause time and cost overruns; quality shortcomings; increasing in claims, disputes and change orders; and even failure of the project. In spite of deficiencies of selecting a contractor by the rule of “the lowest bid price”, it still prevails in many countries including Iran. In this paper, a new contractor selection model based on the best-worst method (BWM) and well-known Fuzzy-VIKOR techniques is proposed as a solution to overcome the deficiencies of the traditional “lowest bid price” rule. An illustrative example of a water channel construction project verified the applicability of the proposed model in practice.
An integrated decision support model based on BWM and fuzzy-VIKOR techniques for contractor selection in construction projects
Sustainable development of any country to some extent depends on successful accomplishment of construction projects, particularly infrastructures. Contractors have a key role in the success of these projects. Hence, the selection of a competent contractor as a complicated and hard decision process has a vital importance in the destiny of any construction project. Contractor selection is in essence a multicriteria decision-making that ought to encompass so many aspects of the project and the client’s requirements on one hand and the capabilities and past records of the contractors on the other hand. Failure in selecting a competent contractor may cause time and cost overruns; quality shortcomings; increasing in claims, disputes and change orders; and even failure of the project. In spite of deficiencies of selecting a contractor by the rule of “the lowest bid price”, it still prevails in many countries including Iran. In this paper, a new contractor selection model based on the best-worst method (BWM) and well-known Fuzzy-VIKOR techniques is proposed as a solution to overcome the deficiencies of the traditional “lowest bid price” rule. An illustrative example of a water channel construction project verified the applicability of the proposed model in practice.
An integrated decision support model based on BWM and fuzzy-VIKOR techniques for contractor selection in construction projects
Naghizadeh Vardin, Aziz (author) / Ansari, Ramin (author) / Khalilzadeh, Mohammad (author) / Antuchevičienė, Jurgita (author) / Baušys, Romualdas (author)
2021-01-01
Sustainability: Special Issue Sustainable Construction Engineering and Management: Enablers of Change, Part II, Basel : MDPI, 2021, vol. 13, iss. 12, art. no. 6933, p. 1-28 ; ISSN 2071-1050
Article (Journal)
Electronic Resource
English
DDC:
690
Contractor Selection in Construction Projects Based on a Fuzzy AHP Method
British Library Conference Proceedings | 2009
|A Fuzzy Decision Framework for Contractor Selection
British Library Online Contents | 2005
|