Analisis Keterlambatan Proyek Konstruksi di PT. PLN (Persero) UIP Sumbagut
Project delays are the main contribution to project cost overruns. The research intends to determine the main factor that cause delays in construction projects at PT. PLN (PERSERO) UIP Sumbagut. In this research, there were 31 variables which were grouped into 6 categories. The research is done by distributing questionnaires to 20 respondents from the owner who also handles the project. The data analysis used a comparison of the percentage, rank mean and standard deviation which were analyzed with Statistical Product and Service Solutions (SPSS). Based on the results of data analysis, it was found that the main factor causing delays in construction projects at PT. PLN (PERSERO) UIP Sumbagut is a shortage of manpower to complete a project. In addition, there are several other dominant factors, namely labor qualifications that do not meet standards; difficulties in financial cash flow and project funding from contractors; scheduling conflicts with sub-contractors and suppliers in the completion of work; security disturbances during the project.
Analisis Keterlambatan Proyek Konstruksi di PT. PLN (Persero) UIP Sumbagut
Project delays are the main contribution to project cost overruns. The research intends to determine the main factor that cause delays in construction projects at PT. PLN (PERSERO) UIP Sumbagut. In this research, there were 31 variables which were grouped into 6 categories. The research is done by distributing questionnaires to 20 respondents from the owner who also handles the project. The data analysis used a comparison of the percentage, rank mean and standard deviation which were analyzed with Statistical Product and Service Solutions (SPSS). Based on the results of data analysis, it was found that the main factor causing delays in construction projects at PT. PLN (PERSERO) UIP Sumbagut is a shortage of manpower to complete a project. In addition, there are several other dominant factors, namely labor qualifications that do not meet standards; difficulties in financial cash flow and project funding from contractors; scheduling conflicts with sub-contractors and suppliers in the completion of work; security disturbances during the project.
Analisis Keterlambatan Proyek Konstruksi di PT. PLN (Persero) UIP Sumbagut
Irwan, Irwan (author) / Ardan, Melloukey (author) / Rangkuti, Nuril Mahda (author) / Monalisa, Febrina (author)
2022-03-01
doi:10.31289/jcebt.v6i1.6817
JOURNAL OF CIVIL ENGINEERING BUILDING AND TRANSPORTATION; Vol 6, No 1 (2022): JCEBT MARET; 20-29 ; 2549-6387 ; 2549-6379 ; 10.31289/jcebt.v6i1
Article (Journal)
Electronic Resource
English
percentage , delay , PLN , questionnaire , contractor , mean , SPSS
DDC:
690
Penyebab Keterlambatan Konstruksi Proyek Jalan Kota Di Provinsi Sumatera Barat
DOAJ | 2023
|ANALISIS PILOT PROJECT RISIKO KETERLAMBATAN PROYEK PADA BANGUNAN GEDUNG TINGGI HUNIAN
BASE | 2020
|