A platform for research: civil engineering, architecture and urbanism
COST-EFFECTIVE EVALUATION ON ASSEMBLING POOL BUILDING
Residential building detail estimation and costing or Quantity surveying The main purpose of this project would be to gain sufficient understanding in planning, analysis, and style of creating and Quantity surveying Our project handles the program and style of the Bank building. It's a reinforced concrete presented structure composed of G 2 with sufficient facilities. IS 456:2000 codes may be the fundamental code for general construction in concrete structures, hence all of the structural people are made using limit condition method in compliance using the IS 456:2000 code and style aids. The look associated with a building in India is going to be identified by National Building Code (NBC) , therefore, the building is planned in compliance using the National Building Code Asia. The residential building has proper ventilation, it will get sufficient doorways, home windows. Water supply and electrification will also be provided. The ceiling height is supplied as 3.2m, for set up structures as pointed out Building Code (NBC).
COST-EFFECTIVE EVALUATION ON ASSEMBLING POOL BUILDING
Residential building detail estimation and costing or Quantity surveying The main purpose of this project would be to gain sufficient understanding in planning, analysis, and style of creating and Quantity surveying Our project handles the program and style of the Bank building. It's a reinforced concrete presented structure composed of G 2 with sufficient facilities. IS 456:2000 codes may be the fundamental code for general construction in concrete structures, hence all of the structural people are made using limit condition method in compliance using the IS 456:2000 code and style aids. The look associated with a building in India is going to be identified by National Building Code (NBC) , therefore, the building is planned in compliance using the National Building Code Asia. The residential building has proper ventilation, it will get sufficient doorways, home windows. Water supply and electrification will also be provided. The ceiling height is supplied as 3.2m, for set up structures as pointed out Building Code (NBC).
COST-EFFECTIVE EVALUATION ON ASSEMBLING POOL BUILDING
Vamsi Krishna, G (author) / Rajarajan, C (author)
2016-10-23
IJITR; Vol 4, No 6 (2016): October - November 2016; 4590-4592
Article (Journal)
Electronic Resource
English
Building Cost-effective Masonry
British Library Online Contents | 2007
|Modelling of active building envelopes for cost-effective evaluation
Fraunhofer Publica | 2017
|