Time-cost optimization using harmony search algorithm in construction projects
WOS:000489302300002 ; In construction projects, the relationship between project cost and duration, which is one of the main factors of the project, are considered the parameters decision-makers. When a construction schedule is planned by the planners, additional resources are allocated to shorten the project duration considering the completion time and cost of the activities so that the most suitable construction schedule is prepared by providing a trade-off between project duration and total cost. In the case of time-cost trade-off problems, the total cost of the project is determined by summing each activities' cost by adding indirect costs. Moreover, total project duration is determined by obtaining total project duration after CPM (Critical Path Method) calculations. Obtaining optimum duration and costs is such a problematic issue with using conventional methods and common software packages. These techniques consider deterministic project values and include CPM calculations for fitness value calculation. Moreover, current studies defined alternatives as non-variable discrete values. However, construction projects are dynamic processes, and quantities are prone to be changed related to project size. In this study, time-cost trade-off optimization is performed by using harmony search method with introducing different implementation that can be more easily used for different projects. The model is implemented in a real construction project, and the conclusions are interpreted. ; Istanbul University Scientific Research Projects UnitIstanbul University [50827] ; The study was financially supported by the Istanbul University Scientific Research Projects Unit under project number 50827 (Istanbul, Turkey).
Time-cost optimization using harmony search algorithm in construction projects
WOS:000489302300002 ; In construction projects, the relationship between project cost and duration, which is one of the main factors of the project, are considered the parameters decision-makers. When a construction schedule is planned by the planners, additional resources are allocated to shorten the project duration considering the completion time and cost of the activities so that the most suitable construction schedule is prepared by providing a trade-off between project duration and total cost. In the case of time-cost trade-off problems, the total cost of the project is determined by summing each activities' cost by adding indirect costs. Moreover, total project duration is determined by obtaining total project duration after CPM (Critical Path Method) calculations. Obtaining optimum duration and costs is such a problematic issue with using conventional methods and common software packages. These techniques consider deterministic project values and include CPM calculations for fitness value calculation. Moreover, current studies defined alternatives as non-variable discrete values. However, construction projects are dynamic processes, and quantities are prone to be changed related to project size. In this study, time-cost trade-off optimization is performed by using harmony search method with introducing different implementation that can be more easily used for different projects. The model is implemented in a real construction project, and the conclusions are interpreted. ; Istanbul University Scientific Research Projects UnitIstanbul University [50827] ; The study was financially supported by the Istanbul University Scientific Research Projects Unit under project number 50827 (Istanbul, Turkey).
Time-cost optimization using harmony search algorithm in construction projects
Zalmai, Lemar Mohammad (author) / Akçay, Cemil (author) / Manısalı, Ekrem (author) / İÜC, Mühendislik Fakültesi, İnşaat Mühendisliği Bölümü
2019-01-01
237
Article (Journal)
Electronic Resource
English
DDC:
690
Multiobjective Optimization of Time-Cost Trade-Off Using Harmony Search
Online Contents | 2010
|Multiobjective Optimization of Time-Cost Trade-Off Using Harmony Search
British Library Online Contents | 2010
|Cost optimization of a composite floor system using an improved harmony search algorithm
Online Contents | 2010
|