The purpose of this paper is to give an overview on the existing literature and recent developments on the research on Schedule Risk Analysis (SRA) in Project Management (PM) to measure the sensitivity of activities and resources in the project network. SRA is a technique that relies on Monte-Carlo simulation runs to analyze the impact of changes in activity durations and costs on the overall project time and cost objectives. First, the paper gives an overview of the most commonly known sensitivity metrics from literature that are widely used by PM software tools to measure the time and cost sensitivity of activities as well as sensitivity for project resources. Second, the relevance of these metrics in an integrated project control setting is discussed based on some recent research studies. Finally, a short discussion on the challenges for future research is given. All sections in this paper are based on research studies done in the past for which references will be given throughout the manuscript.
On the use of schedule risk analysis for project management
The purpose of this paper is to give an overview on the existing literature and recent developments on the research on Schedule Risk Analysis (SRA) in Project Management (PM) to measure the sensitivity of activities and resources in the project network. SRA is a technique that relies on Monte-Carlo simulation runs to analyze the impact of changes in activity durations and costs on the overall project time and cost objectives. First, the paper gives an overview of the most commonly known sensitivity metrics from literature that are widely used by PM software tools to measure the time and cost sensitivity of activities as well as sensitivity for project resources. Second, the relevance of these metrics in an integrated project control setting is discussed based on some recent research studies. Finally, a short discussion on the challenges for future research is given. All sections in this paper are based on research studies done in the past for which references will be given throughout the manuscript.
On the use of schedule risk analysis for project management
Vanhoucke, Mario (author)
2015-01-01
JOURNAL OF MODERN PROJECT MANAGEMENT ; ISSN: 2317-3963
Article (Journal)
Electronic Resource
English
DDC:
690
Schedule Risk Management of Railway Station Project
British Library Conference Proceedings | 2014
|Project schedule risk management through building information modelling
Taylor & Francis Verlag | 2022
|A PROBABILITY ANALYSIS OF CONSTRUCTION PROJECT SCHEDULE USING RISK MANAGEMENT TOOL
BASE | 2017
|Developing benchmarks for project schedule risk estimation
British Library Conference Proceedings | 2003
|Construction Project Network Evaluation with Correlated Schedule Risk Analysis Model
Online Contents | 2008
|