Feeble project mandate equal higher cost?
This Study presents an analytical assessment of each of the Project Mandates and compares the results with the first estimates and final cost of governmental construction projects. The purpose of the study was to find out whether projects executed by a Governmental Agency (Statsbygg) under a less rigid Quality Assurance System behaves or delivers differently than a project that has undergone the national QA system. This paper presents the findings of a study where 19 Norwegian governmental construction projects were examined with the intent to analyze the correlation between the relative strength or weakness of the Project Mandate and the development of cost estimates through a project’s phases. The study examined projects with estimates below the threshold for the Norwegian government’s Quality Assurance system (QA). The project samples, consisting of projects between approx. €7m and €75m, has allowed the authors to examined whether the execution of government construction projects under a less rigid quality assurance system differs from projects that have undergone the national QA system. The relative strength of each Project Mandate was subjectively assessed against parameters related to the project’s scope, assumptions and constraints. On average, the Project Mandates were found to be weak, often with poorly defined scopes and unrealistic constraints. The cost development from the estimated pre-design to completion phase showed an increase of 30%. While the lack of strong Project Mandates prevented the discovery of any conclusive findings in the study of correlation between the strength of the project mandate and cost, we believe that this paper presents novel insight into how smaller projects that have not gone through a rigid QA system behave. ; publishedVersion
Feeble project mandate equal higher cost?
This Study presents an analytical assessment of each of the Project Mandates and compares the results with the first estimates and final cost of governmental construction projects. The purpose of the study was to find out whether projects executed by a Governmental Agency (Statsbygg) under a less rigid Quality Assurance System behaves or delivers differently than a project that has undergone the national QA system. This paper presents the findings of a study where 19 Norwegian governmental construction projects were examined with the intent to analyze the correlation between the relative strength or weakness of the Project Mandate and the development of cost estimates through a project’s phases. The study examined projects with estimates below the threshold for the Norwegian government’s Quality Assurance system (QA). The project samples, consisting of projects between approx. €7m and €75m, has allowed the authors to examined whether the execution of government construction projects under a less rigid quality assurance system differs from projects that have undergone the national QA system. The relative strength of each Project Mandate was subjectively assessed against parameters related to the project’s scope, assumptions and constraints. On average, the Project Mandates were found to be weak, often with poorly defined scopes and unrealistic constraints. The cost development from the estimated pre-design to completion phase showed an increase of 30%. While the lack of strong Project Mandates prevented the discovery of any conclusive findings in the study of correlation between the strength of the project mandate and cost, we believe that this paper presents novel insight into how smaller projects that have not gone through a rigid QA system behave. ; publishedVersion
Feeble project mandate equal higher cost?
Bakke, Christian (author) / Johansen, Agnar (author) / Mohammad Mahmood, Kozhen (author) / Grenland, Steffen (author)
2019-01-01
cristin:1802768
433-440 ; 164 ; Procedia Computer Science
Article (Journal)
Electronic Resource
English
DDC:
690
Vacuum tube amplifier for feeble pulses
Engineering Index Backfile | 1932
|Sewers of the Massachusetts school for the feeble-minded
Engineering Index Backfile | 1890
Controlled Alignments of Feeble Magnetic Particles Utilizing Induced Magnetic Dipole Interactions
British Library Online Contents | 2003
|British Library Online Contents | 2000