Analogy-based model for software project effort estimation
Accurate effort estimation of software development plays an important role to predict how much effort should be prepared during the works of a software project so that it can be completed on time and budget. Some sectors, e.g. banking sectors, were renowned fields of software projects, not only due to its huge size of project, but also extremely expensive and takes a long time to completion. Project estimation is essential for software development project able to run on time and budget with maximum quality. This study aims to investigate the accuracy of software project effort estimation with the Analogy method using three parameters: Euclidean, Manhattan and Minkowski distance. Analogy based estimation consists several stage included similarity measure, analogy adaptation, estimation calculation and model evaluation. The results showed that the best combination of Analogy methods was using Manhattan distance with an accuracy of 50% MMRE, 28% MdMRE and Pred(25) 48%. Thus, we can concluded that this model can be used to predict accurately.
Analogy-based model for software project effort estimation
Accurate effort estimation of software development plays an important role to predict how much effort should be prepared during the works of a software project so that it can be completed on time and budget. Some sectors, e.g. banking sectors, were renowned fields of software projects, not only due to its huge size of project, but also extremely expensive and takes a long time to completion. Project estimation is essential for software development project able to run on time and budget with maximum quality. This study aims to investigate the accuracy of software project effort estimation with the Analogy method using three parameters: Euclidean, Manhattan and Minkowski distance. Analogy based estimation consists several stage included similarity measure, analogy adaptation, estimation calculation and model evaluation. The results showed that the best combination of Analogy methods was using Manhattan distance with an accuracy of 50% MMRE, 28% MdMRE and Pred(25) 48%. Thus, we can concluded that this model can be used to predict accurately.
Analogy-based model for software project effort estimation
Ardiansyah, Ardiansyah (author) / Mardhia, Murein Miksa (author) / Handayaningsih, Sri (author)
2018-11-11
doi:10.26555/ijain.v4i3.266
International Journal of Advances in Intelligent Informatics; Vol 4, No 3 (2018): November 2018; 251-260 ; 2548-3161 ; 2442-6571
Article (Journal)
Electronic Resource
English
DDC:
690
An analogy-based model for estimating design effort
Online Contents | 2001
|An analogy-based model for estimating design effort
British Library Online Contents | 2001
|Analogy-Based Solution to Markup Estimation Problem
British Library Online Contents | 1994
|Analogy-Based Solution to Markup Estimation Problem
Online Contents | 1994
|Software Effort Estimation in early stages of software development: A Review
BASE | 2017
|