SIMULASI OPTIMASI SISTEM PLTH MENGGUNAKAN SOFTWARE HOMER UNTUK MENGHEMAT PEMAKAIAN BBM DI PULAU PENYENGAT TANJUNG PINANG KEPULAUAN RIAU
Abstract Currently electrification on Penyengat Island supplied by Diesel Power Plants with total capacity 285 kW to serve peak load system about 250 kW. This research aims to improve the efficiency of Fuel consumption, by means of implementing a Hybrid Power Plants on Penyengat Island. Methods used in this research is simulating and analyzing the result of optimation Hybrid Power Plants system by using Homer Software version 2.81. This software to optimize based on the lowest value of the NPC (Net Present Cost). In this research, result of the simulation and optimation by Homer Software, show that the Hybrid power plant’s most optimal to be applied on the Penyengat Island is integration between PLTB, PLTS & PLTD. In this condition, the contribution of the electricity production system of PLTS at 43%, PLTB at 41%, PLTD at 16%. With capital cost for $ 1.058.906, Operating Cost for $ 268.758 per year, Net Present Cost for $3.938.507, and Cost of energy for $ 0.249/kWh. While PLTH fuel consumption is 205.601 litres/year, saving fuel consumption of 316.499 litres/year or 60,6%/year. And saving fuel consumption cost of $ 265.859/year Keywords: Penyengat Island, PLTH, PLTS, PLTD, PLTS, Homer
SIMULASI OPTIMASI SISTEM PLTH MENGGUNAKAN SOFTWARE HOMER UNTUK MENGHEMAT PEMAKAIAN BBM DI PULAU PENYENGAT TANJUNG PINANG KEPULAUAN RIAU
Abstract Currently electrification on Penyengat Island supplied by Diesel Power Plants with total capacity 285 kW to serve peak load system about 250 kW. This research aims to improve the efficiency of Fuel consumption, by means of implementing a Hybrid Power Plants on Penyengat Island. Methods used in this research is simulating and analyzing the result of optimation Hybrid Power Plants system by using Homer Software version 2.81. This software to optimize based on the lowest value of the NPC (Net Present Cost). In this research, result of the simulation and optimation by Homer Software, show that the Hybrid power plant’s most optimal to be applied on the Penyengat Island is integration between PLTB, PLTS & PLTD. In this condition, the contribution of the electricity production system of PLTS at 43%, PLTB at 41%, PLTD at 16%. With capital cost for $ 1.058.906, Operating Cost for $ 268.758 per year, Net Present Cost for $3.938.507, and Cost of energy for $ 0.249/kWh. While PLTH fuel consumption is 205.601 litres/year, saving fuel consumption of 316.499 litres/year or 60,6%/year. And saving fuel consumption cost of $ 265.859/year Keywords: Penyengat Island, PLTH, PLTS, PLTD, PLTS, Homer
SIMULASI OPTIMASI SISTEM PLTH MENGGUNAKAN SOFTWARE HOMER UNTUK MENGHEMAT PEMAKAIAN BBM DI PULAU PENYENGAT TANJUNG PINANG KEPULAUAN RIAU
Sukmawidjaja, Maula (author) / Akbar, Ilham (author)
2017-04-15
doi:10.25105/jetri.v11i1.1626
Jetri : Jurnal Ilmiah Teknik Elektro; Jetri Volume 11, Nomor 1, Agustus 2013; 17-42 ; 2541-089X ; 1412-0372
Article (Journal)
Electronic Resource
English
DDC:
690
Valuasi Daya Dukung Fungsi Lindung di Pulau Bintan Propinsi Kepulauan Riau
DOAJ | 2015
|Menara Umno, Pulau Pinang, Malaysia
Online Contents | 1995
POTENSI PEMAKAIAN KERIKIL PATERONGAN TORJUN DAN OMBEN DI PULAU MADURA UNTUK BETON STRUKTUR
DOAJ | 2001
|