An update to the construction of the Suncor oil sands tailings Pond 5 cover
To facilitate reclamation of its Pond 5 oil sands tailings pond, Suncor began construction of a full scale floating cover over the fluid tailings in the pond in January, 2010. The cover is comprised of geosynthetics overlain by petroleum coke and will function as a first step towards achieving a trafficable surface that would allow for further reclamation activities ultimately leading to the closure of the pond. A paper discussing the design of the cover and the initial construction in the winter of 2010 has been published previously. A series of field trials were conducted on the cover in the summer and fall of 2010, and the results of the field trials in addition to data and observations collected during the 2010 winter construction were used to enhance the construction methodology and improve productivity including the use of different and larger construction equipment. This paper discusses and presents these and other novel aspects of constructing a large scale floating cover on a fluid oil sand tailings pond.[All papers were considered for technical and language appropriateness by the organizing committee.] ; Non UBC ; Unreviewed ; Other
An update to the construction of the Suncor oil sands tailings Pond 5 cover
To facilitate reclamation of its Pond 5 oil sands tailings pond, Suncor began construction of a full scale floating cover over the fluid tailings in the pond in January, 2010. The cover is comprised of geosynthetics overlain by petroleum coke and will function as a first step towards achieving a trafficable surface that would allow for further reclamation activities ultimately leading to the closure of the pond. A paper discussing the design of the cover and the initial construction in the winter of 2010 has been published previously. A series of field trials were conducted on the cover in the summer and fall of 2010, and the results of the field trials in addition to data and observations collected during the 2010 winter construction were used to enhance the construction methodology and improve productivity including the use of different and larger construction equipment. This paper discusses and presents these and other novel aspects of constructing a large scale floating cover on a fluid oil sand tailings pond.[All papers were considered for technical and language appropriateness by the organizing committee.] ; Non UBC ; Unreviewed ; Other
An update to the construction of the Suncor oil sands tailings Pond 5 cover
Abusaid, Ayman (author) / Fear, Catherine (author) / McRoberts, Ed (author) / Wells, Sean (author) / Tailings and Mine Waste Conference (2011 : Vancouver, B.C.) / University of British Columbia. Norman B. Keevil Institute of Mining Engineering
2011-11-01
Conference paper
Electronic Resource
English
DDC:
690
Consolidation of Suncor Nonsegregating Tailings
British Library Conference Proceedings | 1994
|Large dykes of the Suncor oil sands mine
Tema Archive | 1988
|Sulfur concrete for haul road construction at Suncor oil sands mines
British Library Online Contents | 2007
|Sulfur concrete for haul road construction at Suncor oil sands mines
Online Contents | 2007
|Suncor Offers Update on Fort Hills
Online Contents | 2017